PERENCANAAN REVETMENT MENGGUNAKAN TUMPUKAN BRONJONG DI PANTAI MEDEWI JEMBRANA
Main Authors: | Lestari, Ni Putu Novi Esti; Mahasiswa Program S1 Teknik Sipil Universitas Warmadewa, Yujana, Cok Agung; Dosen Program Studi Teknik Sipil Universitas Warmadewa, Ardantha, I Wayan; Dosen Program Studi Teknik Sipil Universitas Warmadewa |
---|---|
Format: | Article eJournal |
Bahasa: | ind |
Terbitan: |
Jurusan Teknik Sipil Fakultas Teknik Universitas Warmadewa
, 2013
|
Online Access: |
http://ejournal.warmadewa.ac.id/index.php/paduraksa/article/view/65 |
Daftar Isi:
- Planning Revetment using stacks of gabions on the Beach Medewi this goal is: to get the construction of coastal Revetment appropriate to address the erosion of the coast of Jembrana Medewi, obtain the total cost required for construction of the Revetment and the time required in the construction. The methods used in planning are: - the location of planning, - data collection methods are: methods of literature, survey methods, methods of documentation, - data type include: wind data, topographic data, and bathymetry , data tides. The result of this planning in the form stacks of gabions Revetment construction cost for Rp. 4,766,639,000.00 to the time of the construction is 180 calendar days.