PERENCANAAN KEGIATAN MAINTENANCE DENGAN METODE REABILITY CENTERED MAINTENANCE (RCM) II

Main Authors: Rachmad Hidayat; Jurusan Teknik Industri, Universitas Trunojoyo, PO BOX 2 Kamal Bangkalan, Madura 16912, Indonesia, Nachnul Ansori; Jurusan Teknik Industri, Universitas Trunojoyo, PO BOX 2 Kamal Bangkalan, Madura 16912, Indonesia, Ali Imron; Jurusan Teknik Industri, Universitas Trunojoyo, PO BOX 2 Kamal Bangkalan, Madura 16912, Indonesia
Format: Article application/force-download eJournal
Bahasa: eng
Terbitan: Directorate of Research and Community Engagement, Universitas Indonesia , 2010
Online Access: http://journal.ui.ac.id/index.php/technology/article/view/443
Daftar Isi:
  • Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn piston, and on filter's sponge airs to come out damagethat gets RPN 45. Optimum maintenance interval point one that acquired to prevent failure on compresor screw smallerthan appreciative MTTF which indicate optimum maintenance interval in avoiding its bust happening logisticcomponent before happening damage.Keywords: compresor screw, maintenance activity schedule plan, optimum time maintenance interval, RCM II, riskassessment