Penentuan Jumlah Tenaga Kerja dengan Menggunakan Simulasi Antrian di Departemen Produksi di PT. Surya Tubal Indonesia

Main Authors: Astuti, Murti, Mas'udin, Ilyas
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Department Industrial Engineering, University of Muhammadiyah Malang , 2010
Subjects:
Online Access: https://ejournal.umm.ac.id/index.php/industri/article/view/4
https://ejournal.umm.ac.id/index.php/industri/article/view/4/3
ctrlnum article-4
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">Penentuan Jumlah Tenaga Kerja dengan Menggunakan Simulasi Antrian di Departemen Produksi di PT. Surya Tubal Indonesia</title><creator>Astuti, Murti</creator><creator>Mas'udin, Ilyas</creator><subject lang="en-US">line</subject><subject lang="en-US">server</subject><subject lang="en-US">waiting time</subject><description lang="en-US">In its productionp rocessa, companyis consistedo f variousd epartmentssu pponingo neanother in a good teamwork to build a single unity. Therefore inefiiciency in one of thosedepartmentsw ill affect other departmentsth at in turn will have impact on production outcome.One of thosed epartmentiss producliond epartmentth at is one of the most imponants ectionswhichp laysi mportanrt olei n productions moothness.One of problemsd isturbingt he smoothnesosf flow processin this departmenits theproblemo f long productl ining markedb y considerablwea itingt ime.T his is certainlyi neffectivesince it will not only disturb the production process flow but also decrease the product qualitycausedb y too muchw aitingt ime in the line. Thereforew, e havet o makea n efforti n reducingth eline sizew hile still considert he costj ust in casea n improvemenits made.T o overcometh ismatter,o new ay we couldt akei s utilizinga line simulationb y optimizings ervicefa cilitiesn umber(numbero f laborf orce)w ith minimumc osta ndp roductw aitingt ime.</description><publisher lang="en-US">Department Industrial Engineering, University of Muhammadiyah Malang</publisher><date>2010-04-26</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>File:application/pdf</type><identifier>https://ejournal.umm.ac.id/index.php/industri/article/view/4</identifier><identifier>10.22219/JTIUMM.Vol3.No2.115-120</identifier><source lang="en-US">Jurnal Teknik Industri; Vol. 3 No. 2 (2002); 115-120</source><source>2527-4112</source><source>1978-1431</source><language>eng</language><relation>https://ejournal.umm.ac.id/index.php/industri/article/view/4/3</relation><rights lang="en-US">Copyright (c) 2010 Murti Astuti, Ilyas Mas'udin</rights><recordID>article-4</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:eJournal
author Astuti, Murti
Mas'udin, Ilyas
title Penentuan Jumlah Tenaga Kerja dengan Menggunakan Simulasi Antrian di Departemen Produksi di PT. Surya Tubal Indonesia
publisher Department Industrial Engineering, University of Muhammadiyah Malang
publishDate 2010
topic line
server
waiting time
url https://ejournal.umm.ac.id/index.php/industri/article/view/4
https://ejournal.umm.ac.id/index.php/industri/article/view/4/3
contents In its productionp rocessa, companyis consistedo f variousd epartmentssu pponingo neanother in a good teamwork to build a single unity. Therefore inefiiciency in one of thosedepartmentsw ill affect other departmentsth at in turn will have impact on production outcome.One of thosed epartmentiss producliond epartmentth at is one of the most imponants ectionswhichp laysi mportanrt olei n productions moothness.One of problemsd isturbingt he smoothnesosf flow processin this departmenits theproblemo f long productl ining markedb y considerablwea itingt ime.T his is certainlyi neffectivesince it will not only disturb the production process flow but also decrease the product qualitycausedb y too muchw aitingt ime in the line. Thereforew, e havet o makea n efforti n reducingth eline sizew hile still considert he costj ust in casea n improvemenits made.T o overcometh ismatter,o new ay we couldt akei s utilizinga line simulationb y optimizings ervicefa cilitiesn umber(numbero f laborf orce)w ith minimumc osta ndp roductw aitingt ime.
id IOS2034.article-4
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection Jurnal Teknik Industri
repository_id 2034
subject_area Rekayasa
city MALANG
province JAWA TIMUR
repoId IOS2034
first_indexed 2016-09-23T02:45:30Z
last_indexed 2023-02-23T11:04:50Z
recordtype dc
_version_ 1767065175093936128
score 17.13294