Faktor-faktor risiko Cost Overrun pada biaya Overhead yang berpengaruh terhadap kinerja biaya akhir proyek pembangunan Pipeline dan stasiun gas di PT X = Cost overrun risk factor on overhead that influence the final cost performance of the gas pipeline and station development project in PT X
Main Authors: | Victor A.P. Siregar, author, Add author: Yusuf Latief, supervisor, Add author: Ismeth Abidin, examiner, Add author: Sitorus, Juanto, supervisor, Add author: Mohammed Ali Berawi, examiner, Add author: Eddy Subiyanto, examiner |
---|---|
Format: | Masters Bachelors |
Terbitan: |
Fakultas Teknik Universitas Indonesia
, 2011
|
Subjects: | |
Online Access: |
https://lib.ui.ac.id/detail?id=20291919 |