Perancangan model pemilihan mitra kerja dalam penyediaan rig darat dengan metode analytic network process (ANP) = Design of partners selection model in the provision of land rigs using analytic network process (ANP) method
Main Author: | M. Rifai Aji Wibowo, author |
---|---|
Format: | Masters Bachelors |
Terbitan: |
, 2010
|
Online Access: |
https://lib.ui.ac.id/detail?id=20275914 |
Daftar Isi:
- [<b>ABSTRAK</b><br> Tesis ini membahas mengenai cara untuk memilih mitra kerja dalam penyediaan rig darat berdasarkan kriteria pada evaluasi administrasi, evaluasi teknis, dan evaluasi harga, dengan menggunakan metode Analytic Network Process (ANP). Hasil penelitian ini menunjukkan bahwa evaluasi teknis mempunyai bobot tertinggi, diikuti oleh evaluasi administrasi dan evaluasi harga; dan sub kriteria yang paling berpengaruh adalah peralatan rig. <hr> <b>ABSTRACT</b><br> This thesis discusses about how to select partners in the supply of land rigs based on the criteria for the administrative evaluation, technical evaluation and financial evaluation, using the Analytic Network Process (ANP). Results of this study indicate that the technical evaluation has the highest weighting, followed by administration evaluation and financial evaluation; and the most influential sub criteria are the rig equipment.;This thesis discusses about how to select partners in the supply of land rigs based on the criteria for the administrative evaluation, technical evaluation and financial evaluation, using the Analytic Network Process (ANP). Results of this study indicate that the technical evaluation has the highest weighting, followed by administration evaluation and financial evaluation; and the most influential sub criteria are the rig equipment., This thesis discusses about how to select partners in the supply of land rigs based on the criteria for the administrative evaluation, technical evaluation and financial evaluation, using the Analytic Network Process (ANP). Results of this study indicate that the technical evaluation has the highest weighting, followed by administration evaluation and financial evaluation; and the most influential sub criteria are the rig equipment.]