Analisis resiko proyek EPC dan alokasi dana kontingensinya (studi kasus PT. XYZ. proyek pembangkit listrik tenaga uap X) = EPC project risk analysis and contingency cost allocation (Case: PT. XYZ, project coal fired steam power plant x)
Format: | Bachelors |
---|---|
Terbitan: |
Fakultas Teknik Universitas Indonesia
, 2008
|
Online Access: |
http://lib.ui.ac.id/file?file=digital/2016-9/20249929-S50285-Rr. Nurthia.pdf |
Description not available. |