CCTV - case study traffic management highway tunnel

Main Authors: SCHREIBERS, Kirsten B.J., BOUCHIER, Joost L.A.
Format: Proceeding eJournal
Terbitan: , 2014
Online Access: https://zenodo.org/record/3537096
Daftar Isi:
  • For traffic managers supervising a newly built highway tunnel the existing individual video wall with four 30"LCD-TFT displays was replaced by six 46" LCD-TFT displays. Obvious deterioration of some video wall qualities occurred: smaller images, lower resolution, twofold increase of monitor luminance (risk of glare). However the traffic managers were much happier. Which parameter really influences perceived image quality?