WeCount Engagement Toolkit Phase 3: Data Collection

Main Author: Ideas for Change
Format: info Lainnya Journal
Terbitan: , 2021
Online Access: https://zenodo.org/record/5667082
Daftar Isi:
  • At this stage the data collection campaign begins. This phase also includes the crucial aspects concerning the assembly, preparation, and distribution of the Telraam sensors as well as their installation at the participants’ homes. Once sensors have been deployed and installed, further actions to complement the quantitative data collected by the Telraam sensor with qualitative data are proposed together with resources and methods to address the need of continuous support to participants during their experience of hosting a sensor. The following tools are proposed in addition to the phase detailed overview (see pdf file). Tool, Step-by-Step Installation Guide: this resource consists of a printed step-by-step installation guide. While a complete description is already available on the Telraam website, the learning from initial experiences informed that, a printed and more detailed version of it would have facilitated the onboarding and registration process of participants. The guide consists of a 12 pages booklet comprising detailed descriptions supported by images about the actual process for each step to be followed during the installation. The process has been broken down into 16 basic steps. It is made available in English and Spanish. Tool, WeCount Sensing Diary: the tool is in the form of a notebook or notepad and can include a calendar. Participants are asked to input any possible information that in their opinion might have affected a specific measure from Telraam – e.g. road closed for works, festival etc.This tool could be included at the end of the Step-by-Step installation guide Telraam installation video (English): https://www.youtube.com/watch?v=PtWafiievfE&ab_channel=WeCount). Telraam installation spoken tutorial (Spanish): (https://www.youtube.com/watch?v=l8XKh6BcJF8&feature=emb_title