Rancang Bangun Prototipe Aplikasi Penjadwalan Perbaikan Kapal di CV. Bahtera Indah
Main Authors: | Yosika, Herny Ernytria, Sholiq, Sholiq |
---|---|
Format: | Proceeding PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2006
|
Subjects: | |
Online Access: |
https://repository.dinamika.ac.id/id/eprint/356/1/2006-V-96.pdf https://repository.dinamika.ac.id/id/eprint/356/ |
Daftar Isi:
- The objective of scheduling minimize total time required for solving entire jobs and minimize mean time a job in the system. Factors that inluence in arranging ship reparation services schedule is: number variation, weight ship enlist, diference time initial time enlist, reparation time and dock time available. In this research analysis done to compare some methods application i.e. first come first serve, shortest processing time, and the longest processing time(LPT) with minimize makespan and mean flows time. Result test shows that LPT method is accurate method for CV Bahtera Indah because supporting company required is minimum makespan and mean flow time.