ANALISIS KETERLAMBATAN PROSES BONGKAR MUATAN CURAH CLINKER PADA MV. KT 02 DI PELABUHAN SEMEN DUMAI

Main Author: AGUS, ERIYANTO
Format: Thesis NonPeerReviewed Pdf
Bahasa: ind
Terbitan: , 2020
Subjects:
Online Access: http://repository.pip-semarang.ac.id/2398/1/52155584%20N_SKRIPSI_FULLTEXT.pdf
http://repository.pip-semarang.ac.id/2398/2/52155584%20N_SKRIPSI_OPEN_ACCESS.pdf
http://repository.pip-semarang.ac.id/2398/
http://www.library.pip-semarang.ac.id
ctrlnum 2398
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.pip-semarang.ac.id/2398/</relation><title>ANALISIS KETERLAMBATAN PROSES BONGKAR MUATAN CURAH &#xD; CLINKER PADA MV. KT 02 DI PELABUHAN SEMEN DUMAI</title><creator>AGUS, ERIYANTO</creator><subject>Nautika</subject><description>ABSTRAKSI &#xD; &#xD; Eriyanto, Agus, 2020, NIT : 52155584.N, &#x201C;Analisis keterlambatan proses bongkar&#xD; muatan curah clinker pada MV. KT 02 di pelabuhan semen Dumai&#x201D;. Skripsi.&#xD; Program Diploma IV, Program Studi Nautika, Politeknik Ilmu Pelayaran&#xD; Semarang. Pembimbing I : Capt. I Kadek Laju, S.H., M.M, Pembimbing II :&#xD; Dr. Riyanto.,SE., M.Pd. &#xD; &#xD; Proses pelaksanaan bongkar muatan diharapkan dapat berhasil dengan baik &#xD; dan berjalan dengan lancar, namun pada kenyataannya terdapat faktor-faktor yang &#xD; menyebabkan terlambatnya proses bongkar. Untuk itu para perwira kapal dituntut &#xD; untuk memiliki pengetahuan yang memadai baik secara teori maupun praktek&#xD; tentang jenis-jenis muatan, perencanaan pemuatan, sifat dan kualitas barang yang&#xD; akan di muat, perawatan muatan, penggunaan alat bongkar muat dan ketentuan lain&#xD; yang menyangkut masalah keselamatan kapal dan muatan. Tujuannya untuk&#xD; mengetahui faktor yang menyebabkan keterlambatan di MV. KT 02 pada saat&#xD; proses bongkar dan untuk mengetahui upaya yang dilakukan untuk mencegah&#xD; terjadinya keterlambatan proses bongkar muatan clinker.&#xD; &#xD; Metode yang digunakan adalah metode deskriptif kualitatif, sedangkan teknik&#xD; pengumpulan data yang digunakan adalah wawancara, observasi, dan dokumentasi&#xD; yang berhubungan dengan penanganan muatan terutama pada saat proses bongkar.&#xD; &#xD; Dari hasil penelitian tersebut dapat diperoleh data tentang faktor penyebab&#xD; keterlambatan proses bongkar muatan curah clinker yaitu kejadian putusnya wire crane&#xD; kapal, patahnya penyanggah roller belt dan as roller belt conveyor, operator crane yang&#xD; kurang terampil, kurangnya pengawasan petugas jaga saat proses bongkar. Maka untuk&#xD; menanggulangi hal tersebut dibutuhkan adanya kerja sama yang baik ditunjang dengan&#xD; pengawasan yang optimal serta perawatan alat bongkar muat yang rutin. &#xD; &#xD; &#xD; &#xD; ABSTRACT &#xD; &#xD; Eriyanto, Agus. 2020. &#x201C;Analysis of the delay in the loading process of clinker bulk&#xD; loads on MV. KT 02 at the cement port of Dumai&#x201D;, Diploma IV Program,&#xD; Nautical Study Program, Politeknik Ilmu Pelayaran Semarang, Advisor I:&#xD; Capt. I KADEK LAJU, S.H., M.M., Supervisor II: Dr. RIYANTO, SE.,M.Pd. &#xD; &#xD; The process of loading and unloading is expected to be successful and run &#xD; smoothly, but in reality there are factors that cause the delay in the unloading process.&#xD; For this reason, ship officers are required to have adequate knowledge both in theory &#xD; and practice regarding the types of cargo, loading planning, nature and quality of goods &#xD; to be loaded, cargo maintenance, use of loading and unloading equipment and other&#xD; provisions relating to ship safety issues and the charge. The aim is to find out the factors&#xD; that cause delays in the MV. KT 02 during the unloading process and to find out the&#xD; efforts made to prevent delays in the loading process of the clinker.&#xD; &#xD; The method used is a descriptive qualitative method, while the data collection&#xD; techniques used are interviews, observation, and documentation relating to handling&#xD; the load, especially during the unloading process.&#xD; &#xD; From the results of this research can be obtained data about the factors that&#xD; cause delays in the process of unloading clinker bulk cargo, namely the breaking of&#xD; ship wire cranes, the breaking of the roller belt propeller and axle roller conveyor, the&#xD; less skilled crane operators, the lack of supervision of the guards during the unloading&#xD; process. So to overcome this it needs a good cooperation supported by optimal&#xD; supervision and maintenance of routine loading and unloading equipment.</description><date>2020</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Other:Pdf</type><language>ind</language><identifier>http://repository.pip-semarang.ac.id/2398/1/52155584%20N_SKRIPSI_FULLTEXT.pdf</identifier><type>Other:Pdf</type><language>ind</language><identifier>http://repository.pip-semarang.ac.id/2398/2/52155584%20N_SKRIPSI_OPEN_ACCESS.pdf</identifier><identifier> AGUS, ERIYANTO (2020) ANALISIS KETERLAMBATAN PROSES BONGKAR MUATAN CURAH CLINKER PADA MV. KT 02 DI PELABUHAN SEMEN DUMAI. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG. </identifier><relation>http://www.library.pip-semarang.ac.id</relation><recordID>2398</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Other:Pdf
Other
author AGUS, ERIYANTO
title ANALISIS KETERLAMBATAN PROSES BONGKAR MUATAN CURAH CLINKER PADA MV. KT 02 DI PELABUHAN SEMEN DUMAI
publishDate 2020
topic Nautika
url http://repository.pip-semarang.ac.id/2398/1/52155584%20N_SKRIPSI_FULLTEXT.pdf
http://repository.pip-semarang.ac.id/2398/2/52155584%20N_SKRIPSI_OPEN_ACCESS.pdf
http://repository.pip-semarang.ac.id/2398/
http://www.library.pip-semarang.ac.id
contents ABSTRAKSI Eriyanto, Agus, 2020, NIT : 52155584.N, “Analisis keterlambatan proses bongkar muatan curah clinker pada MV. KT 02 di pelabuhan semen Dumai”. Skripsi. Program Diploma IV, Program Studi Nautika, Politeknik Ilmu Pelayaran Semarang. Pembimbing I : Capt. I Kadek Laju, S.H., M.M, Pembimbing II : Dr. Riyanto.,SE., M.Pd. Proses pelaksanaan bongkar muatan diharapkan dapat berhasil dengan baik dan berjalan dengan lancar, namun pada kenyataannya terdapat faktor-faktor yang menyebabkan terlambatnya proses bongkar. Untuk itu para perwira kapal dituntut untuk memiliki pengetahuan yang memadai baik secara teori maupun praktek tentang jenis-jenis muatan, perencanaan pemuatan, sifat dan kualitas barang yang akan di muat, perawatan muatan, penggunaan alat bongkar muat dan ketentuan lain yang menyangkut masalah keselamatan kapal dan muatan. Tujuannya untuk mengetahui faktor yang menyebabkan keterlambatan di MV. KT 02 pada saat proses bongkar dan untuk mengetahui upaya yang dilakukan untuk mencegah terjadinya keterlambatan proses bongkar muatan clinker. Metode yang digunakan adalah metode deskriptif kualitatif, sedangkan teknik pengumpulan data yang digunakan adalah wawancara, observasi, dan dokumentasi yang berhubungan dengan penanganan muatan terutama pada saat proses bongkar. Dari hasil penelitian tersebut dapat diperoleh data tentang faktor penyebab keterlambatan proses bongkar muatan curah clinker yaitu kejadian putusnya wire crane kapal, patahnya penyanggah roller belt dan as roller belt conveyor, operator crane yang kurang terampil, kurangnya pengawasan petugas jaga saat proses bongkar. Maka untuk menanggulangi hal tersebut dibutuhkan adanya kerja sama yang baik ditunjang dengan pengawasan yang optimal serta perawatan alat bongkar muat yang rutin. ABSTRACT Eriyanto, Agus. 2020. “Analysis of the delay in the loading process of clinker bulk loads on MV. KT 02 at the cement port of Dumai”, Diploma IV Program, Nautical Study Program, Politeknik Ilmu Pelayaran Semarang, Advisor I: Capt. I KADEK LAJU, S.H., M.M., Supervisor II: Dr. RIYANTO, SE.,M.Pd. The process of loading and unloading is expected to be successful and run smoothly, but in reality there are factors that cause the delay in the unloading process. For this reason, ship officers are required to have adequate knowledge both in theory and practice regarding the types of cargo, loading planning, nature and quality of goods to be loaded, cargo maintenance, use of loading and unloading equipment and other provisions relating to ship safety issues and the charge. The aim is to find out the factors that cause delays in the MV. KT 02 during the unloading process and to find out the efforts made to prevent delays in the loading process of the clinker. The method used is a descriptive qualitative method, while the data collection techniques used are interviews, observation, and documentation relating to handling the load, especially during the unloading process. From the results of this research can be obtained data about the factors that cause delays in the process of unloading clinker bulk cargo, namely the breaking of ship wire cranes, the breaking of the roller belt propeller and axle roller conveyor, the less skilled crane operators, the lack of supervision of the guards during the unloading process. So to overcome this it needs a good cooperation supported by optimal supervision and maintenance of routine loading and unloading equipment.
id IOS15573.2398
institution Politeknik Ilmu Pelayaran Semarang (PIP Semarang)
affiliation onesearch.perpusnas.go.id
fkp2tn.onesearch.id
institution_id 1472
institution_type library:university
library
library Perpustakaan PIP Semarang
library_id 1245
collection Repository PIP Semarang
repository_id 15573
city KOTA SEMARANG
province JAWA TENGAH
shared_to_ipusnas_str 1
repoId IOS15573
first_indexed 2021-05-18T01:02:01Z
last_indexed 2021-05-18T01:02:01Z
recordtype dc
_version_ 1700056160952909824
score 17.538404