PERANCANGAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR JALAN SEKAYU – BATAS MUARA ENIM STA 2+250 – 7+560 KABUPATEN MUSI BANYUASIN PROVINSI SUMATERA SELATAN
Main Authors: | Suryadi, Ahmad, Iwari, Yudha |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/6791/1/COVER%20LA.pdf http://eprints.polsri.ac.id/6791/2/BAB%20I.pdf http://eprints.polsri.ac.id/6791/3/BAB%20II.pdf http://eprints.polsri.ac.id/6791/4/BAB%20III.pdf http://eprints.polsri.ac.id/6791/5/BAB%20IV.pdf http://eprints.polsri.ac.id/6791/6/BAB%20V.pdf http://eprints.polsri.ac.id/6791/7/Daftar%20Pustaka.pdf http://eprints.polsri.ac.id/6791/ |
ctrlnum |
6791 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/6791/</relation><title>PERANCANGAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR
JALAN SEKAYU – BATAS MUARA ENIM STA 2+250 – 7+560
KABUPATEN MUSI BANYUASIN
PROVINSI SUMATERA SELATAN</title><creator>Suryadi, Ahmad</creator><creator>Iwari, Yudha</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>ABSTRAK



Melihat pengguna kendaraan meningkat di daerah ini ditandai dengan bertambahnya volume kendaraan, maka di bangunlah Jalan Sekayu – Batas Muara Enim. Dimana dengan adanya pembangunan jalan ini diharapkan dapat meningkatkan perekonomian, sosial dan kesejahteraan masyarakat setempat.
Di dalam merencanakan desain geometrik jalan raya, hal–hal yang menjadi acuan dalam perencanaan meliputi perhitungan alinyemen horizontal, alinyemen vertikal, kelas jalan, serta menetapan perkerasan apa yang digunakan.
Dari hasil perhitungan – perhitungan yang panjang jalannya adalah 5,310 Km maka Jalan Sekayu – Batas Muara Enim ini merupakan jalan Kolektor kelas II A dengan kecepatan rencana 60 km/jam, terdapat 2 lajur 2 arah dengan lebar jalan 2 x 3,5 m, dan lebar bahu jalan 2 m. Pada jalan ini menggunakan 8 buah tikungan. Direncanakan menggunakan tipe perkerasan lentur. Pembangunan ruas jalan ini dilaksanakan dalam waktu 246 hari kalender dengan total biaya Rp. 52.755.867.000,00 ( lima puluh dua miliyar tujuh ratus lima puluh lima juta delapan ratus enam puluh tujuh ribu rupiah )</description><date>2019-07</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/1/COVER%20LA.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/6791/7/Daftar%20Pustaka.pdf</identifier><identifier> Suryadi, Ahmad and Iwari, Yudha (2019) PERANCANGAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR JALAN SEKAYU – BATAS MUARA ENIM STA 2+250 – 7+560 KABUPATEN MUSI BANYUASIN PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>6791</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Suryadi, Ahmad Iwari, Yudha |
title |
PERANCANGAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR
JALAN SEKAYU – BATAS MUARA ENIM STA 2+250 – 7+560
KABUPATEN MUSI BANYUASIN
PROVINSI SUMATERA SELATAN |
publishDate |
2019 |
topic |
TA Engineering (General). Civil engineering (General) |
url |
http://eprints.polsri.ac.id/6791/1/COVER%20LA.pdf http://eprints.polsri.ac.id/6791/2/BAB%20I.pdf http://eprints.polsri.ac.id/6791/3/BAB%20II.pdf http://eprints.polsri.ac.id/6791/4/BAB%20III.pdf http://eprints.polsri.ac.id/6791/5/BAB%20IV.pdf http://eprints.polsri.ac.id/6791/6/BAB%20V.pdf http://eprints.polsri.ac.id/6791/7/Daftar%20Pustaka.pdf http://eprints.polsri.ac.id/6791/ |
contents |
ABSTRAK
Melihat pengguna kendaraan meningkat di daerah ini ditandai dengan bertambahnya volume kendaraan, maka di bangunlah Jalan Sekayu – Batas Muara Enim. Dimana dengan adanya pembangunan jalan ini diharapkan dapat meningkatkan perekonomian, sosial dan kesejahteraan masyarakat setempat.
Di dalam merencanakan desain geometrik jalan raya, hal–hal yang menjadi acuan dalam perencanaan meliputi perhitungan alinyemen horizontal, alinyemen vertikal, kelas jalan, serta menetapan perkerasan apa yang digunakan.
Dari hasil perhitungan – perhitungan yang panjang jalannya adalah 5,310 Km maka Jalan Sekayu – Batas Muara Enim ini merupakan jalan Kolektor kelas II A dengan kecepatan rencana 60 km/jam, terdapat 2 lajur 2 arah dengan lebar jalan 2 x 3,5 m, dan lebar bahu jalan 2 m. Pada jalan ini menggunakan 8 buah tikungan. Direncanakan menggunakan tipe perkerasan lentur. Pembangunan ruas jalan ini dilaksanakan dalam waktu 246 hari kalender dengan total biaya Rp. 52.755.867.000,00 ( lima puluh dua miliyar tujuh ratus lima puluh lima juta delapan ratus enam puluh tujuh ribu rupiah ) |
id |
IOS15200.6791 |
institution |
Politeknik Negeri Sriwijaya |
institution_id |
186 |
institution_type |
library:university library |
library |
Perpustakaan Politeknik Negeri Sriwijaya |
library_id |
333 |
collection |
Perpustakaan Politeknik Negeri Sriwijaya |
repository_id |
15200 |
city |
KOTA PALEMBANG |
province |
SUMATERA SELATAN |
repoId |
IOS15200 |
first_indexed |
2021-08-25T09:33:06Z |
last_indexed |
2021-08-25T09:33:06Z |
recordtype |
dc |
_version_ |
1709058354313166848 |
score |
17.538404 |