ANALISA DROP TEGANGAN PADA JARINGAN DISTRIBUSI PRIMER 20 kV DI GARDU INDUK TALANG KELAPADENGAN MENGGUNAKAN SOFTWARE ETAP 12.6
Main Author: | FAISAL, - |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2016
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/3795/1/1_Cover%2C%20Hal.Pengesahan%2Cdll.pdf http://eprints.polsri.ac.id/3795/2/2_BAB%20I.pdf http://eprints.polsri.ac.id/3795/3/3_BAB%20II.pdf http://eprints.polsri.ac.id/3795/4/4_BAB%20III.pdf http://eprints.polsri.ac.id/3795/5/5_BAB%20IV.pdf http://eprints.polsri.ac.id/3795/6/6_BAB%20V.pdf http://eprints.polsri.ac.id/3795/7/7_DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/3795/ |
Daftar Isi:
- Electrical power is one needs primary human because without any electric power man would be hard to exercise as usual .Distribution system is part of a system of electrical power.Distribution system this is useful to channel electric power in terms of human resources electricity great even to consumers and will cause drop voltage on every channel electric power.Drop voltage is allowed to distribution system to 5 % to network system radial.So that need attention is whether value drop voltage still within the limits of standard allowed.This report talk about drop voltage out on distribution network electric power.Calculation in a report this is done through case study in distribution network a primary in substationtalangkelapa .The results of calculationsdropvoltage with the manual method during peak load and peak load during the night each of each feeder of 5-20% that exceeds the tolerance limits have been set at SPLN 72: 1987 at 5%. While drop voltage by 12.6 etap software simulation methods during peak hours of day and night occurs in feeder Bima, Nakula, Krisna, Semar, Yudistira, Sadewa, Sinta and Rama. The cause of the voltage drop is long distribution channels, the value of current that is sent to each feeder, and types of conductors that are widely used.