PERENCANAAN JEMBATAN RANGKA BAJA AIR LAHAM KABUPATEN OGAN KOMERING ULU PROVINSI SUMATERA SELATAN
Main Authors: | IKKRIYAH, CHIRA, AMANDA, YUNIMA ADISA |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2016
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/3687/1/COVER.pdf http://eprints.polsri.ac.id/3687/2/BAB%20I%20AIR%20LAHAM.pdf http://eprints.polsri.ac.id/3687/3/BAB%20II%20AIR%20LAHAM.pdf http://eprints.polsri.ac.id/3687/4/BAB%20III%20AIR%20LAHAM.pdf http://eprints.polsri.ac.id/3687/5/BAB%20IV%20AIR%20LAHAM.pdf http://eprints.polsri.ac.id/3687/6/BAB%20V%20AIR%20LAHAM.pdf http://eprints.polsri.ac.id/3687/ |
Daftar Isi:
- Air Laham bridges with spans of 50 m is the access between Kemalajaya village to Gunung Meraksa village district of Ogan Komering Ulu. The Goverment Of Ogan Komering Ulu rebuild the bridges caused of the old bridges has a serious demage. There are some reference dsign planning includesthe calculation of the floos plate of vehicles, sidewalks, wind ties, main frame, tread plat, wing walls, abutments and foundations. From the above calculation , the Air laham bridge planned to use thickness of the plate vehicle floor 30 cm , sidewalks 50 cm of high and 100 cm of wide , transverse girder using steel profiles WF 800 x 300 x 16 x 30 , the main frame profile WF 400 mm x 400 mm x 45 mm x 70 mm , the abutments with dimensions of 4 m length 12, 4 m Width, Height 7,70 m , by using the pile for foundation . Air Laham Bridge construction is planned with a time of 153 days , with a total estimated cost Rp 19.707.187.536 .