ctrlnum 368
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/368/</relation><title>PERHITUNGAN SETTING RELE ARUS LEBIH PADA TRAFO SISI 20KV&#xD; DI GARDU INDUK BUKIT ASAM</title><creator>Yonner Hutapea, Surya</creator><subject>TJ Mechanical engineering and machinery</subject><description>Surya Yonner Hutapea&#xD; 0611 3031 0189&#xD; Electro Engineering Department&#xD; Study Programs of Electrical Engineering&#xD; State Polytechnic of Sriwijaya&#xD; Main substation of Bukit Asam has 2 different voltages, that is 150 KV and 20 KV. For the sake&#xD; of optimal energy distribution, then both sides are connected by using a power transformator with&#xD; capacity of 60 MVA. Then from both channel is sent to the other feeder and main substation by&#xD; transmission channel. On transformator mounted an Over Current Relay (OCR) as pacifier&#xD; against the fault current, OCR is an equipment that serves as the monitoring of the occurrence of&#xD; overcurrent interruption, then give signals to the circuit breaker (CB) to open impaired channels.&#xD; OCR works based on the value of the current setting and the specified time. After calculating the&#xD; current setting from the OCR obtained at 20 KV side is 5.31 A by tms 0.0065 s and the specified&#xD; operating time is 0.1 s.&#xD; Key words : over current relay, circuit breaker, current setting.</description><date>2014-07</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/1/1%20COVER.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/2/2%20BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/3/3%20BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/4/4%20BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/5/5%20BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/6/6%20BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/7/7%20Daftar%20Pustaka.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/368/8/8%20Lampiran.pdf</identifier><identifier> Yonner Hutapea, Surya (2014) PERHITUNGAN SETTING RELE ARUS LEBIH PADA TRAFO SISI 20KV DI GARDU INDUK BUKIT ASAM. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>368</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Yonner Hutapea, Surya
title PERHITUNGAN SETTING RELE ARUS LEBIH PADA TRAFO SISI 20KV DI GARDU INDUK BUKIT ASAM
publishDate 2014
topic TJ Mechanical engineering and machinery
url http://eprints.polsri.ac.id/368/1/1%20COVER.pdf
http://eprints.polsri.ac.id/368/2/2%20BAB%20I.pdf
http://eprints.polsri.ac.id/368/3/3%20BAB%20II.pdf
http://eprints.polsri.ac.id/368/4/4%20BAB%20III.pdf
http://eprints.polsri.ac.id/368/5/5%20BAB%20IV.pdf
http://eprints.polsri.ac.id/368/6/6%20BAB%20V.pdf
http://eprints.polsri.ac.id/368/7/7%20Daftar%20Pustaka.pdf
http://eprints.polsri.ac.id/368/8/8%20Lampiran.pdf
http://eprints.polsri.ac.id/368/
contents Surya Yonner Hutapea 0611 3031 0189 Electro Engineering Department Study Programs of Electrical Engineering State Polytechnic of Sriwijaya Main substation of Bukit Asam has 2 different voltages, that is 150 KV and 20 KV. For the sake of optimal energy distribution, then both sides are connected by using a power transformator with capacity of 60 MVA. Then from both channel is sent to the other feeder and main substation by transmission channel. On transformator mounted an Over Current Relay (OCR) as pacifier against the fault current, OCR is an equipment that serves as the monitoring of the occurrence of overcurrent interruption, then give signals to the circuit breaker (CB) to open impaired channels. OCR works based on the value of the current setting and the specified time. After calculating the current setting from the OCR obtained at 20 KV side is 5.31 A by tms 0.0065 s and the specified operating time is 0.1 s. Key words : over current relay, circuit breaker, current setting.
id IOS15200.368
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:27:46Z
last_indexed 2021-08-25T09:27:46Z
recordtype dc
_version_ 1709058411634622464
score 17.538404