CALCULATION OF LABOR AND MATERIAL NEEDS IN BUILDING AND HOUSING BASED ON SNI 2008 USING MICROSOFT EXCEL MACROS

Main Authors: Setiawan, Eman, Tistogondo, Julistyana, Bagio, Tony Hartono, Afaq, Roufil
Format: Article NonPeerReviewed Book
Bahasa: eng
Terbitan: Politeknik Negeri Sriwijaya , 2016
Subjects:
Online Access: http://eprints.polsri.ac.id/3582/1/0-cover-depan.pdf
http://eprints.polsri.ac.id/3582/2/0-toc.pdf
http://eprints.polsri.ac.id/3582/3/D2.pdf
http://eprints.polsri.ac.id/3582/
http://first.polsri.ac.id
ctrlnum 3582
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/3582/</relation><title>CALCULATION OF LABOR AND MATERIAL NEEDS IN BUILDING AND HOUSING BASED ON SNI 2008 USING MICROSOFT EXCEL MACROS</title><creator>Setiawan, Eman</creator><creator>Tistogondo, Julistyana</creator><creator>Bagio, Tony Hartono</creator><creator>Afaq, Roufil</creator><subject>QA Mathematics</subject><subject>QA76 Computer software</subject><subject>TA Engineering (General). Civil engineering (General)</subject><subject>TD Environmental technology. Sanitary engineering</subject><description>In a project in the field of civil engineering before construction activities required prior to the calculation of the basic unit price of work (HSPK), the draft budget (RAB), as well as the need for labor and materials. During this process a lot of calculations done by Microsoft Excel Program manually input the reference design is the Indonesian National Standard (SNI). Microsoft Excel very easily recognizable function (user interface), but sometimes the difficulty browse through original value or loss of cell resource, in addition to the output of Microsoft Excel do not meet all the needs. There the results of the planners only in the form HSPK and RAB do not cover the needs of labor and materials. Microsoft Excel Macro is one of the alternative programs that can calculate HSPK, RAB, as well as the need for labor and materials. The program is simple enough where the zoom is also equal to excel and do not need to see the formula of each cell. Construction of two-storey house calculated all its needs using the Microsoft Excel Macros, but at a fixed volume calculation process using Microsoft Excel Manual. The coefficient is used as an input program Microsoft Excel Macros is SNI 2008 on buildings. The result is the unit price in accordance with SNI 2008, the draft budget (RAB), need for labor in Unit One Day, and material needs in a unit adapted to SNI.</description><publisher>Politeknik Negeri Sriwijaya</publisher><date>2016</date><type>Journal:Article</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/3582/1/0-cover-depan.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/3582/2/0-toc.pdf</identifier><type>Book:Book</type><language>eng</language><rights>cc_by_nc_nd</rights><identifier>http://eprints.polsri.ac.id/3582/3/D2.pdf</identifier><identifier> Setiawan, Eman and Tistogondo, Julistyana and Bagio, Tony Hartono and Afaq, Roufil (2016) CALCULATION OF LABOR AND MATERIAL NEEDS IN BUILDING AND HOUSING BASED ON SNI 2008 USING MICROSOFT EXCEL MACROS. Proceeding Forum in Research, Science, and Technology (FIRST) 2016. ISSN 2461-0739 </identifier><relation>http://first.polsri.ac.id</relation><recordID>3582</recordID></dc>
language eng
format Journal:Article
Journal
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Setiawan, Eman
Tistogondo, Julistyana
Bagio, Tony Hartono
Afaq, Roufil
title CALCULATION OF LABOR AND MATERIAL NEEDS IN BUILDING AND HOUSING BASED ON SNI 2008 USING MICROSOFT EXCEL MACROS
publisher Politeknik Negeri Sriwijaya
publishDate 2016
topic QA Mathematics
QA76 Computer software
TA Engineering (General). Civil engineering (General)
TD Environmental technology. Sanitary engineering
url http://eprints.polsri.ac.id/3582/1/0-cover-depan.pdf
http://eprints.polsri.ac.id/3582/2/0-toc.pdf
http://eprints.polsri.ac.id/3582/3/D2.pdf
http://eprints.polsri.ac.id/3582/
http://first.polsri.ac.id
contents In a project in the field of civil engineering before construction activities required prior to the calculation of the basic unit price of work (HSPK), the draft budget (RAB), as well as the need for labor and materials. During this process a lot of calculations done by Microsoft Excel Program manually input the reference design is the Indonesian National Standard (SNI). Microsoft Excel very easily recognizable function (user interface), but sometimes the difficulty browse through original value or loss of cell resource, in addition to the output of Microsoft Excel do not meet all the needs. There the results of the planners only in the form HSPK and RAB do not cover the needs of labor and materials. Microsoft Excel Macro is one of the alternative programs that can calculate HSPK, RAB, as well as the need for labor and materials. The program is simple enough where the zoom is also equal to excel and do not need to see the formula of each cell. Construction of two-storey house calculated all its needs using the Microsoft Excel Macros, but at a fixed volume calculation process using Microsoft Excel Manual. The coefficient is used as an input program Microsoft Excel Macros is SNI 2008 on buildings. The result is the unit price in accordance with SNI 2008, the draft budget (RAB), need for labor in Unit One Day, and material needs in a unit adapted to SNI.
id IOS15200.3582
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:31:05Z
last_indexed 2021-08-25T09:31:05Z
recordtype dc
_version_ 1709058376404566016
score 17.538404