  • Electric power has a very important role in the electric power system. Where electrical power is needed to drive the electric motors. Electricity is a major requirement for a plant to be able to operate the generator. After the start the operation of the turbine is complete then obtained an electric power is its own electrical power usage. Where a load is installed can affect its own large electric power consumption is required. To find out how much electrical power is required in the use of its own power plant units 1,2,3 and 4 Sector Bukit Asam then do a calculation. The presence of a calculation can determine the most efficient calculation to determine the use of its own power. Through the calculation results are then obtained its own large electric power consumption in accordance with the calculation of production planning, calculation Kwh own use, load calculation attached.