Daftar Isi:
  • To support and increase the food production in OganKomeringIlir district, There are are some ways to do that, one of them is the planning and construction of irrigation sub-secondary canal in South of SumberAgung village, Lempuing. This final report contains the irrigation network planning, canal’s dimensions planning, aqueduct’s planning, planning of off-take in tertiary canal with Romijn gate or Crump-de Gruyter gate, dropsctructre’s planning, syphon’s planning, box-culvert’s planning, cost budget plancalculation, along with other components such as the project management concering the implementationnetwork planningschedule, explementation of technical specifications and construction jobs drawings. The planning of irrigation network is planned to meet or this final report includes rainfall data, map, and others. This project used method of Aljabar, Pen Man method, and others. Based on calculations derived dimensions of trafezoid-shaped primary channel which sub-secondary 4, Q = 0,742 m3/det; b = 1,5 m; h = 0,74 m; V = 0,45 m/det/l; I = 0,0004558m. Sub-secondary 5, b = 1,3 m; h = 0,67 m; V = 0,5 m/det/l; I =0,0005595 m. Sub-secondary 6,Q = 0,4 m b = 0,7 m; h = 0,71 m; V = 0,4 m/det/l; I = 0,0004994m. This project requires Rp7,507,334,296– of budgets (Seven billion, five hundred and seven million, three hundred and thirty four, two hundred and ninety six rupiahs).