ANALISA PENYETELAN RELAI GANGGUAN TANAH (GFR) PADA PENYULANG TRAFO 2 30 MVA 70/20 KV DI PT. PLN (PERSERO) GARDU INDUK BOOM BARU PALEMBANG
Main Author: | Sari, Eka Aprianti Permata |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2015
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/1732/1/COVER.pdf http://eprints.polsri.ac.id/1732/2/BAB%20I.pdf http://eprints.polsri.ac.id/1732/3/BAB%20II.pdf http://eprints.polsri.ac.id/1732/4/BAB%20III.pdf http://eprints.polsri.ac.id/1732/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1732/6/BAB%20V.pdf http://eprints.polsri.ac.id/1732/7/DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/1732/ |
ctrlnum |
1732 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1732/</relation><title>ANALISA PENYETELAN RELAI GANGGUAN TANAH (GFR) PADA PENYULANG TRAFO 2 30 MVA 70/20 KV DI PT. PLN (PERSERO) GARDU INDUK BOOM BARU PALEMBANG</title><creator>Sari, Eka Aprianti Permata </creator><subject>TK Electrical engineering. Electronics Nuclear engineering</subject><description>Medium voltage distribution network is a network of 20 kV primary distribution substations supplied from power plants or diesel using medium voltage cable line (SKTM) or medium voltage air line (SUTM). Short circuit often occurs at 20 kV network, interphase (3 phase or 2 phase), short circuit or phase to ground. If the protection is less good coordination, it can cause widespread blackout. So protective equipment used is over current relay (OCR) and ground fault relay (GFR) which will work to instruct the PMT to open so disturbed SKTM be separated from network. From the discussion known that 1 phase fault current to ground influenced by fault location and setting of ground fault relay is calculated in accordance with the conditions that have been set in the field.
Key Words : Protection, Fault Current, Ground Fault Relay</description><date>2015-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/1/COVER.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1732/7/DAFTAR%20PUSTAKA.pdf</identifier><identifier> Sari, Eka Aprianti Permata (2015) ANALISA PENYETELAN RELAI GANGGUAN TANAH (GFR) PADA PENYULANG TRAFO 2 30 MVA 70/20 KV DI PT. PLN (PERSERO) GARDU INDUK BOOM BARU PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1732</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Sari, Eka Aprianti Permata |
title |
ANALISA PENYETELAN RELAI GANGGUAN TANAH (GFR) PADA PENYULANG TRAFO 2 30 MVA 70/20 KV DI PT. PLN (PERSERO) GARDU INDUK BOOM BARU PALEMBANG |
publishDate |
2015 |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
url |
http://eprints.polsri.ac.id/1732/1/COVER.pdf http://eprints.polsri.ac.id/1732/2/BAB%20I.pdf http://eprints.polsri.ac.id/1732/3/BAB%20II.pdf http://eprints.polsri.ac.id/1732/4/BAB%20III.pdf http://eprints.polsri.ac.id/1732/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1732/6/BAB%20V.pdf http://eprints.polsri.ac.id/1732/7/DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/1732/ |
contents |
Medium voltage distribution network is a network of 20 kV primary distribution substations supplied from power plants or diesel using medium voltage cable line (SKTM) or medium voltage air line (SUTM). Short circuit often occurs at 20 kV network, interphase (3 phase or 2 phase), short circuit or phase to ground. If the protection is less good coordination, it can cause widespread blackout. So protective equipment used is over current relay (OCR) and ground fault relay (GFR) which will work to instruct the PMT to open so disturbed SKTM be separated from network. From the discussion known that 1 phase fault current to ground influenced by fault location and setting of ground fault relay is calculated in accordance with the conditions that have been set in the field.
Key Words : Protection, Fault Current, Ground Fault Relay |
id |
IOS15200.1732 |
institution |
Politeknik Negeri Sriwijaya |
institution_id |
186 |
institution_type |
library:university library |
library |
Perpustakaan Politeknik Negeri Sriwijaya |
library_id |
333 |
collection |
Perpustakaan Politeknik Negeri Sriwijaya |
repository_id |
15200 |
city |
KOTA PALEMBANG |
province |
SUMATERA SELATAN |
repoId |
IOS15200 |
first_indexed |
2021-08-25T09:29:11Z |
last_indexed |
2021-08-25T09:29:11Z |
recordtype |
dc |
_version_ |
1709058394647691264 |
score |
17.538404 |