PERENCANAAN GEOMETRIK DAN PERKERASAN PADA RUAS JALAN LINGKAR BETUNG STA 0+000 – STA 5+036 PROVINSI SUMATERA SELATAN
Main Authors: | RACHMI, BETARI , SIREGAR, WINDI MELINDA |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2015
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/1570/1/FILE.pdf http://eprints.polsri.ac.id/1570/2/BAB%20I.pdf http://eprints.polsri.ac.id/1570/3/BAB%20II.pdf http://eprints.polsri.ac.id/1570/4/BAB%20III.pdf http://eprints.polsri.ac.id/1570/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1570/6/BAB%20V.pdf http://eprints.polsri.ac.id/1570/7/BAB%20VI.pdf http://eprints.polsri.ac.id/1570/8/DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/1570/ |
Daftar Isi:
- Road construction is a vital necessity as the main supporter of economic activity both at central and regional levels. One is the area of Betung because the area are potential area for agribusiness and agro- industries. The final report this writing, the author would like to know how the planning and design of geometric and consrtuction pavement on The Road Lingkar Betung STA 0+000 - STA 5+036, so thatthe road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alignment calculation, vertical alignment, hard compact and define what that will be used. From the results of above calculations, so The Road Lingkar Betung is a road with the speed of the road plan 80 km/hour, and this road used 6 curves including 2 Spiral-Spiral and 4 Spiral Circle Spiral. For surface area hard compact thickness is 7 cm used asphalt concrete, sub base is 15 cm used split class A and base is 21 cm used sirtu class B. This road building was carried out within 112 days with a total fund IDR. 52.464.500.000.