PERENCANAAN SALURAN PRIMER DAN SEKUNDER RUAS 1 –3 DAERAH IRIGASI AIR SALING KABUPATEN EMPAT LAWANG
Main Author: | Sari, Ayu Ratna |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2015
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/1560/1/COVER.pdf http://eprints.polsri.ac.id/1560/2/BAB%201.pdf http://eprints.polsri.ac.id/1560/3/BAB%202.pdf http://eprints.polsri.ac.id/1560/4/BAB%203.pdf http://eprints.polsri.ac.id/1560/5/BAB%204.pdf http://eprints.polsri.ac.id/1560/6/BAB%205.pdf http://eprints.polsri.ac.id/1560/7/DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/1560/ |
Daftar Isi:
- The final report is about the planning of primary and secondary network in air saling irrigation area. This report discusses the planning and calculation of the dimensions of the secondery line SR3 until SR1 with a total channel length of 1010,5 m. In addition to planning, there are 6 tertiary channels. The planning of the irrigation network is planned to meet or support the food production and food production is increasing. Planning data for the writing of this final report includes rainfall data, map, and others. The method used is the method of Thiessen and methods Penmann and others. Based on calculations derived dimensions of each trapezoid-shaped primary channel for. SSSR3, dengan b= 2,30 m, h= 0,90 m, V= 0,57 m/det, I= 0,0002932, L= 260 m. SSSR2, dengan b= 2,30 m, h= 0,90 m, V= 0,57 m/det, I= 0,0003016, L= 277,5 m. SSSR1, dengan b= 2,35 m, h= 0,90 m, V= 0,58 m/det, I= 0,0003022, L= 230 m. SPSR1, dengan b= 0,55 m, h= 0,85 m, V= 0,60 m/det, I= 0,0003443, L=243 m. In implementing this project requires funding budget of Rp. 8.687.640.000,00. Key words: Secondary Channels, Irrigation, Thiessen method.