ctrlnum 1542
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1542/</relation><title>PERENCANAAN SALURAN SEKUNDER DAERAH IRIGASI&#xD; ENDIKAT BENGKOK KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN</title><creator>Dali, Rachmad Rizky </creator><creator>Prastyanto, Slamet Mardi </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>The final report contains the planning of irrigation in the village Segamit, village Siring Agung, village Aremantai, and village Fajar Bulan sub-district Semende Darat Ulu regency Muara Enim . This report discusses the planning and calculation of the dimensions of the secondary channels of the Secondary Channels Small Echoes Segment 1 (SSE1) to Secondary Channel Small Echoes Segment 5 (SSE5) with a total length 2192 m.&#xD; Where the purpose of the construction project of irrigation channels Endikat Bengkok is to support the national food supply, so it is necessary to be the availability of water in the area even though the land is located far from sources of water.&#xD; The data plan for this final report include rainfall data, map, and others. The method used is the method mean Algebra and methods of Penman and others.&#xD; From the calculation results obtained for SSE1 secondary channel dimensions, with A = 560 Ha, Q = 0,750 m3/s, L = 281 m. SSE2 , dengan A = 552 Ha, Q = 0,740 m3/s, L = 472 m. SSE3 , dengan A = 524 Ha, Q = 0,702 m3/s, L = 671 m. SSE4 , dengan A = 518 Ha, Q = 0,0,694 m3/s, L = 218 m. SSE5 ,dengan A = 440 Ha, Q = 0,590 m3/s, L = 550 m. In this plan requires funding budget of Rp 6.614.459.307,46.&#xD; Keywords: Irrigation, Endikat Bengkok, Secondary Channel.</description><date>2015-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/1/COVER.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1542/7/DAFTAR%20PUSTAKA.pdf</identifier><identifier> Dali, Rachmad Rizky and Prastyanto, Slamet Mardi (2015) PERENCANAAN SALURAN SEKUNDER DAERAH IRIGASI ENDIKAT BENGKOK KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1542</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Dali, Rachmad Rizky
Prastyanto, Slamet Mardi
title PERENCANAAN SALURAN SEKUNDER DAERAH IRIGASI ENDIKAT BENGKOK KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN
publishDate 2015
topic TA Engineering (General). Civil engineering (General)
url http://eprints.polsri.ac.id/1542/1/COVER.pdf
http://eprints.polsri.ac.id/1542/2/BAB%20I.pdf
http://eprints.polsri.ac.id/1542/3/BAB%20II.pdf
http://eprints.polsri.ac.id/1542/4/BAB%20III.pdf
http://eprints.polsri.ac.id/1542/5/BAB%20IV.pdf
http://eprints.polsri.ac.id/1542/6/BAB%20V.pdf
http://eprints.polsri.ac.id/1542/7/DAFTAR%20PUSTAKA.pdf
http://eprints.polsri.ac.id/1542/
contents The final report contains the planning of irrigation in the village Segamit, village Siring Agung, village Aremantai, and village Fajar Bulan sub-district Semende Darat Ulu regency Muara Enim . This report discusses the planning and calculation of the dimensions of the secondary channels of the Secondary Channels Small Echoes Segment 1 (SSE1) to Secondary Channel Small Echoes Segment 5 (SSE5) with a total length 2192 m. Where the purpose of the construction project of irrigation channels Endikat Bengkok is to support the national food supply, so it is necessary to be the availability of water in the area even though the land is located far from sources of water. The data plan for this final report include rainfall data, map, and others. The method used is the method mean Algebra and methods of Penman and others. From the calculation results obtained for SSE1 secondary channel dimensions, with A = 560 Ha, Q = 0,750 m3/s, L = 281 m. SSE2 , dengan A = 552 Ha, Q = 0,740 m3/s, L = 472 m. SSE3 , dengan A = 524 Ha, Q = 0,702 m3/s, L = 671 m. SSE4 , dengan A = 518 Ha, Q = 0,0,694 m3/s, L = 218 m. SSE5 ,dengan A = 440 Ha, Q = 0,590 m3/s, L = 550 m. In this plan requires funding budget of Rp 6.614.459.307,46. Keywords: Irrigation, Endikat Bengkok, Secondary Channel.
id IOS15200.1542
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:28:58Z
last_indexed 2021-08-25T09:28:58Z
recordtype dc
_version_ 1709058397221945344
score 17.538404