Daftar Isi:
  • A retaining wall land serves as anchoring the ground to avoid scours land and prevent dislocation in around land. Due to prevent dislocation cause river of suspects Ogan and to improve highway traffic in the Kamal village sub-district Pamulutan Barat as a means highway from Indralaya alternative to the city op Palembang. The installation of a retaining wall Kamal village sub-district Pamulutan Barat is using the system the walls of anchored sheetpile with a free end support method with the depth of the sheetpile of the main (right) is 18 meters and the depth of the sheetpile anchor (left) is 9 meters. Conctraction of a retaining wall of this land consisting of the structure steel sheet pile of the right and left, ancho, steel U- Channel and pile cap. The total cost of the budget plan calculation of planning the development of a retaining wall Kamal village sub district Pamulutan Barat is 3.533.659.000,00 Rupiah’s (three billion five hundred thirty three million six hundred fifty nine thousand rupiah’s) for 93 a calender day. The keywords : land retaining wall a method of execution total budget