ctrlnum 1535
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1535/</relation><title>PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN&#xD; RUAS JALAN NGOB-NGOB KABUPATEN EMPAT LAWANG&#xD; PROVINSI SUMATERA SELATAN&#xD; STA 0+000 s/d 5+310,22</title><creator>Merliansyah, -</creator><creator>Prihadinah, Eka </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>The border street of Ngob &#x2013; Ngob was in Empat Lawang district. This&#xD; street have the important things to improve the grew of economy in around of the&#xD; village, also to increase people life in all of the parts. In this final report, the writer&#xD; do the re-planning. How the best way in the planning geometric design, the harden&#xD; flexible construction, the classify of street, and the calculation of cost in Ngob &#x2013;&#xD; Ngob until the street can bring the peaceful, comfortable and reachable for&#xD; customer.&#xD; In the planning of geometric design street, the guidance there are the&#xD; calculation alinyemen horizontal, alinyemen vertical, classify of street, and what&#xD; the harden was used.&#xD; Based on the calculation above, found that Ngob &#x2013; Ngob was in the&#xD; classify II B with the planning speed 50 km/hour, there are 2 band and 2 column&#xD; where the width of street 2 x 3 m and the width of street shoulder. In this street&#xD; was use 6 curves with thick harden, covering layer of the street where width 17,5&#xD; cm, the over covering layer the street was use the split classify A with the thick 10&#xD; cm, mean while the under covering layer of the street was use Sirtu classify B&#xD; with the thick 15 cm. Developing this street was done in 191 days with the total&#xD; cost Rp. 21.429.137.271,00.</description><date>2015-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/1/identitas_mahasiswa_eka_prihadinah.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1535/7/daftar%20pustaka.pdf</identifier><identifier> Merliansyah, - and Prihadinah, Eka (2015) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN RUAS JALAN NGOB-NGOB KABUPATEN EMPAT LAWANG PROVINSI SUMATERA SELATAN STA 0+000 s/d 5+310,22. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1535</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Merliansyah, -
Prihadinah, Eka
title PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN RUAS JALAN NGOB-NGOB KABUPATEN EMPAT LAWANG PROVINSI SUMATERA SELATAN STA 0+000 s/d 5+310,22
publishDate 2015
topic TA Engineering (General). Civil engineering (General)
url http://eprints.polsri.ac.id/1535/1/identitas_mahasiswa_eka_prihadinah.pdf
http://eprints.polsri.ac.id/1535/2/BAB%20I.pdf
http://eprints.polsri.ac.id/1535/3/BAB%20II.pdf
http://eprints.polsri.ac.id/1535/4/BAB%20III.pdf
http://eprints.polsri.ac.id/1535/5/BAB%20IV.pdf
http://eprints.polsri.ac.id/1535/6/BAB%20V.pdf
http://eprints.polsri.ac.id/1535/7/daftar%20pustaka.pdf
http://eprints.polsri.ac.id/1535/
contents The border street of Ngob – Ngob was in Empat Lawang district. This street have the important things to improve the grew of economy in around of the village, also to increase people life in all of the parts. In this final report, the writer do the re-planning. How the best way in the planning geometric design, the harden flexible construction, the classify of street, and the calculation of cost in Ngob – Ngob until the street can bring the peaceful, comfortable and reachable for customer. In the planning of geometric design street, the guidance there are the calculation alinyemen horizontal, alinyemen vertical, classify of street, and what the harden was used. Based on the calculation above, found that Ngob – Ngob was in the classify II B with the planning speed 50 km/hour, there are 2 band and 2 column where the width of street 2 x 3 m and the width of street shoulder. In this street was use 6 curves with thick harden, covering layer of the street where width 17,5 cm, the over covering layer the street was use the split classify A with the thick 10 cm, mean while the under covering layer of the street was use Sirtu classify B with the thick 15 cm. Developing this street was done in 191 days with the total cost Rp. 21.429.137.271,00.
id IOS15200.1535
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:28:58Z
last_indexed 2021-08-25T09:28:58Z
recordtype dc
_version_ 1709058397367697408
score 17.538404