ctrlnum 1534
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1534/</relation><title>PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU&#xD; PADA RUAS JALAN BETUNG &#x2013; SUNGAI LILIN&#xD; STA 21+000 &#x2013; 29+000&#xD; PROVINSI SUMATERA SELATAN</title><creator>HASBULLAH, ADAM </creator><creator>ANGGARA, WAHYUDI TIRTA </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Highway contruction is the most important that we need to make a good economic&#xD; in our city. Betung and Sungai Lilin have potensial areas for agribusiness and&#xD; agro-indsutries so to make good connection between Betung and sungai lilin, we&#xD; need comfort road and In this final report, the writer do the re-planning. How the&#xD; best way in the planning geomatric design, the harden rigid contruction, the&#xD; classify of street, and the calculation of cost in Betung &#x2013; Sungai Lilin untill the&#xD; street can bring the peaceful, comfortable and reachable for the customer.&#xD; In the planning of geomatric design street, the guidance there are the&#xD; calculation alinyemen horizontal, alinyemen vertical, classify of street, and what&#xD; the harden was used. Based on the calculation above, found that Betung &#x2013; Sungai&#xD; Lilin was in the classify I with the planning speed 80 km/jam, 8 intersection we&#xD; use are 3 Spiral &#x2013; Spiral, 2 Full Circle, dan 3 Spiral Circle Spiral. In this street&#xD; we use rigid pavement K &#x2013; 300 with the thick 26 cm. Developing this street was&#xD; done in 146 days with the total cost Rp 35.424.000.000 (Tiga Puluh Lima Milyar&#xD; Empat Ratus Dua Puluh Empat Juta Rupiah).&#xD; Key word : The road, geometric design, thickness of rigid pavement.</description><date>2015-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/1/Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1534/7/Daftar%20Pustaka.pdf</identifier><identifier> HASBULLAH, ADAM and ANGGARA, WAHYUDI TIRTA (2015) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN BETUNG &#x2013; SUNGAI LILIN STA 21+000 &#x2013; 29+000 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1534</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author HASBULLAH, ADAM
ANGGARA, WAHYUDI TIRTA
title PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN BETUNG – SUNGAI LILIN STA 21+000 – 29+000 PROVINSI SUMATERA SELATAN
publishDate 2015
topic TA Engineering (General). Civil engineering (General)
url http://eprints.polsri.ac.id/1534/1/Cover.pdf
http://eprints.polsri.ac.id/1534/2/BAB%20I.pdf
http://eprints.polsri.ac.id/1534/3/BAB%20II.pdf
http://eprints.polsri.ac.id/1534/4/BAB%20III.pdf
http://eprints.polsri.ac.id/1534/5/BAB%20IV.pdf
http://eprints.polsri.ac.id/1534/6/BAB%20V.pdf
http://eprints.polsri.ac.id/1534/7/Daftar%20Pustaka.pdf
http://eprints.polsri.ac.id/1534/
contents Highway contruction is the most important that we need to make a good economic in our city. Betung and Sungai Lilin have potensial areas for agribusiness and agro-indsutries so to make good connection between Betung and sungai lilin, we need comfort road and In this final report, the writer do the re-planning. How the best way in the planning geomatric design, the harden rigid contruction, the classify of street, and the calculation of cost in Betung – Sungai Lilin untill the street can bring the peaceful, comfortable and reachable for the customer. In the planning of geomatric design street, the guidance there are the calculation alinyemen horizontal, alinyemen vertical, classify of street, and what the harden was used. Based on the calculation above, found that Betung – Sungai Lilin was in the classify I with the planning speed 80 km/jam, 8 intersection we use are 3 Spiral – Spiral, 2 Full Circle, dan 3 Spiral Circle Spiral. In this street we use rigid pavement K – 300 with the thick 26 cm. Developing this street was done in 146 days with the total cost Rp 35.424.000.000 (Tiga Puluh Lima Milyar Empat Ratus Dua Puluh Empat Juta Rupiah). Key word : The road, geometric design, thickness of rigid pavement.
id IOS15200.1534
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:28:58Z
last_indexed 2021-08-25T09:28:58Z
recordtype dc
_version_ 1709058397396008960
score 17.538404