ctrlnum 1531
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1531/</relation><title>PERENCANAAN JEMBATAN RANGKA BAJA&#xD; AIR MUARA RAMBANG KABUPATEN OGAN ILIR&#xD; PROVINSI SUMATERA SELATAN</title><creator>Sulastriani, Bunga </creator><creator>Sari, Dwi Arum Ambar </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Air bridge construction in the village of Muara Rambang Lubuk Keliat Ogan Ilir&#xD; is because the existing bridges damaged by landslides. This bridge is one of the&#xD; access road to Baturaja, because it is to cope with the damage then, the&#xD; Department of Public Works Highways South Sumatra Province to build a new&#xD; bridge next to the broken bridge to serve traffic to and from Baturaja.&#xD; In the plan the design of this bridge, the reference in the planning includes the&#xD; calculation of the floor plate of vehicles, sidewalks, transverse girder, shear&#xD; connector, main frame, bonding wind up / down as well as foundation, tread plate,&#xD; wingwalls, abutments and foundations.&#xD; From the results of the calculations above, Bridges Steel Frame Air Muara&#xD; Rambang Ogan Ilir uses the vehicle floor plate thickness of 30 cm, width 50 cm&#xD; pavement with high and 60 cm, transverse girder steel profile WF 400 x 400 x 18&#xD; x 28, order The main use of steel profile WF 400 x 400 x 30 x 50, the dimensions&#xD; of the abutment width of 3.5 m length of 8,6m and 6,51m high. The development&#xD; is carried out within a period of 144 days with a total fund of Rp.&#xD; 17,061,525,526.19</description><date>2015-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/1/1.%20cover%2C%20hal%20pengesahan%2C%20kata%20pengantar%2C%20motto%2C%20daftar%20isi.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/2/BAB%201.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/3/bab%202%20LA.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/4/bab%203.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/5/bab%204.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1531/7/DAFTAR%20PUSTAKA.pdf</identifier><identifier> Sulastriani, Bunga and Sari, Dwi Arum Ambar (2015) PERENCANAAN JEMBATAN RANGKA BAJA AIR MUARA RAMBANG KABUPATEN OGAN ILIR PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1531</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Sulastriani, Bunga
Sari, Dwi Arum Ambar
title PERENCANAAN JEMBATAN RANGKA BAJA AIR MUARA RAMBANG KABUPATEN OGAN ILIR PROVINSI SUMATERA SELATAN
publishDate 2015
topic TA Engineering (General). Civil engineering (General)
url http://eprints.polsri.ac.id/1531/1/1.%20cover%2C%20hal%20pengesahan%2C%20kata%20pengantar%2C%20motto%2C%20daftar%20isi.pdf
http://eprints.polsri.ac.id/1531/2/BAB%201.pdf
http://eprints.polsri.ac.id/1531/3/bab%202%20LA.pdf
http://eprints.polsri.ac.id/1531/4/bab%203.pdf
http://eprints.polsri.ac.id/1531/5/bab%204.pdf
http://eprints.polsri.ac.id/1531/6/BAB%20V.pdf
http://eprints.polsri.ac.id/1531/7/DAFTAR%20PUSTAKA.pdf
http://eprints.polsri.ac.id/1531/
contents Air bridge construction in the village of Muara Rambang Lubuk Keliat Ogan Ilir is because the existing bridges damaged by landslides. This bridge is one of the access road to Baturaja, because it is to cope with the damage then, the Department of Public Works Highways South Sumatra Province to build a new bridge next to the broken bridge to serve traffic to and from Baturaja. In the plan the design of this bridge, the reference in the planning includes the calculation of the floor plate of vehicles, sidewalks, transverse girder, shear connector, main frame, bonding wind up / down as well as foundation, tread plate, wingwalls, abutments and foundations. From the results of the calculations above, Bridges Steel Frame Air Muara Rambang Ogan Ilir uses the vehicle floor plate thickness of 30 cm, width 50 cm pavement with high and 60 cm, transverse girder steel profile WF 400 x 400 x 18 x 28, order The main use of steel profile WF 400 x 400 x 30 x 50, the dimensions of the abutment width of 3.5 m length of 8,6m and 6,51m high. The development is carried out within a period of 144 days with a total fund of Rp. 17,061,525,526.19
id IOS15200.1531
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:28:58Z
last_indexed 2021-08-25T09:28:58Z
recordtype dc
_version_ 1709058397447389184
score 17.538404