ctrlnum 1377
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1377/</relation><title>PERENCANAAN JARINGAN IRIGASI SEKUNDER DAERAH&#xD; IRIGASI LEBAK DATUK KABUPATEN OKU TIMUR PROVINSI&#xD; SUMATERA SELATAN</title><creator>Artika, Winda </creator><creator>Romadhon, Bimo </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>This final report contains the planning of irrigation system in the&#xD; Irrigation Area Lebak Datuk Kabupaten OKU Timur District of South&#xD; Sumatra Province. This report discusses the planning and calculation of&#xD; channel dimensions both primary, secondary, or tertiary. The data plan for the&#xD; writing of the final report includes a situation map data, rainfall data, and&#xD; climatological data (air temperature data, the data of air humidity, wind speed&#xD; data, and the data of solar radiation). The method used is the normal ratio&#xD; method, algebraic method, Penman method, and others. Has 32 Primary and&#xD; Secondary Network with a total length of 33500m using water sliding doors,&#xD; the large dimensions of the channel are at Saluran Induk Lebak Datuk 1&#xD; (SILD.1) with width (b) 3,00m and height (h) 1,3m and channel dimensions&#xD; parent / secondary smallest is the Saluran Muka Agung Jati 6 Kiri&#xD; (SMAJ6.Ki) with the width (b) 0.3m and height (h) 0.3m. In this plan requires&#xD; a fee of Rp. 59,458,493,000, - the time during the 313-day labor jobs.&#xD; Keywords: Irrigation, Lebak Datuk.</description><date>2014-07</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/1/Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1377/7/Daftar%20Pustaka.pdf</identifier><identifier> Artika, Winda and Romadhon, Bimo (2014) PERENCANAAN JARINGAN IRIGASI SEKUNDER DAERAH IRIGASI LEBAK DATUK KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1377</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Artika, Winda
Romadhon, Bimo
title PERENCANAAN JARINGAN IRIGASI SEKUNDER DAERAH IRIGASI LEBAK DATUK KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN
publishDate 2014
topic TA Engineering (General). Civil engineering (General)
url http://eprints.polsri.ac.id/1377/1/Cover.pdf
http://eprints.polsri.ac.id/1377/2/BAB%20I.pdf
http://eprints.polsri.ac.id/1377/3/BAB%20II.pdf
http://eprints.polsri.ac.id/1377/4/BAB%20III.pdf
http://eprints.polsri.ac.id/1377/5/BAB%20IV.pdf
http://eprints.polsri.ac.id/1377/6/BAB%20V.pdf
http://eprints.polsri.ac.id/1377/7/Daftar%20Pustaka.pdf
http://eprints.polsri.ac.id/1377/
contents This final report contains the planning of irrigation system in the Irrigation Area Lebak Datuk Kabupaten OKU Timur District of South Sumatra Province. This report discusses the planning and calculation of channel dimensions both primary, secondary, or tertiary. The data plan for the writing of the final report includes a situation map data, rainfall data, and climatological data (air temperature data, the data of air humidity, wind speed data, and the data of solar radiation). The method used is the normal ratio method, algebraic method, Penman method, and others. Has 32 Primary and Secondary Network with a total length of 33500m using water sliding doors, the large dimensions of the channel are at Saluran Induk Lebak Datuk 1 (SILD.1) with width (b) 3,00m and height (h) 1,3m and channel dimensions parent / secondary smallest is the Saluran Muka Agung Jati 6 Kiri (SMAJ6.Ki) with the width (b) 0.3m and height (h) 0.3m. In this plan requires a fee of Rp. 59,458,493,000, - the time during the 313-day labor jobs. Keywords: Irrigation, Lebak Datuk.
id IOS15200.1377
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:28:45Z
last_indexed 2021-08-25T09:28:45Z
recordtype dc
_version_ 1709058399047516160
score 17.538404