PERENCANAAN SALURAN DRAINASE PERUMAHAN SPRING HILL DI TALANG KELAPA PALEMBANG
Main Authors: | Helmi, Sri Rizkiani , Sirait, Dona Rodefflyn |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/1357/1/Cover%2CMotto%20pdf.pdf http://eprints.polsri.ac.id/1357/2/Bab%201.pdf http://eprints.polsri.ac.id/1357/3/Bab%20II.pdf http://eprints.polsri.ac.id/1357/4/Bab%20III.pdf http://eprints.polsri.ac.id/1357/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1357/6/BAB%20V.pdf http://eprints.polsri.ac.id/1357/ |
Daftar Isi:
- Tangerang – Cinpondoh street is a road that connects Tangerang to Cipondoh area, this road has a very important role in economic growth both local and national. Wrote this final report the author would like to know how to plan and design of geometric and hard compact on Tangerang – Cipondoh street, so the road will be able to give a sense of secure, convenient, and economical way for the user. In the planning design of geometric road, there are some references in planning include calculation of the horizontal alignment , vertical alignment, hard compact and define what that will be used. As the results of calculations, Tangerang – Cipondoh street is classificate to class II A road with planning speed 70 km/hour, and this road used 8 curves. For surface area, hard compact thickness is 7.5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 20 cm used sirtu class A. This road building was carried out within 113 days with a total fund Rp 34,542,339,400.00