PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN LINGKAR LUAR BARAT KOTA PALEMBANG BANYUASIN – JAKABARING PROVINSI SUMATERA SELATAN STA 0+000 – STA 5+250
Main Authors: | Susandi, Alek, Astra Yudha, Ona |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/1295/1/Cover.pdf http://eprints.polsri.ac.id/1295/2/BAB%20I.pdf http://eprints.polsri.ac.id/1295/3/BAB%20II.pdf http://eprints.polsri.ac.id/1295/4/BAB%20III.pdf http://eprints.polsri.ac.id/1295/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1295/6/BAB%20V.pdf http://eprints.polsri.ac.id/1295/7/Daftar%20Pustaka.pdf http://eprints.polsri.ac.id/1295/ |
ctrlnum |
1295 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/1295/</relation><title>PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
JALAN LINGKAR LUAR BARAT KOTA
PALEMBANG BANYUASIN – JAKABARING
PROVINSI SUMATERA SELATAN
STA 0+000 – STA 5+250</title><creator>Susandi, Alek</creator><creator>Astra Yudha, Ona</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>The Road Lingkar Luar Barat Palembang City Banyuasin – Jakabaring street
is a road that connects the Banyuasin and cross Jakabaring, this road has a very
important role in promoting economic growth both locally and nationally. The
final report this writing, the author would like to know how the planning and
design of geometric and hard compact on Lingkar Luar Barat Palembang City
Banyuasin – Jakabaring street, so that the road will be able to give a sense of
security, convenient, and economical way for the user.
In the planning design of geometric road, things become a reference in
planning include the horizontal alinyemen calculation, vertical alinyemen, hard
compact and define what that will be used.
From the results of above calculations, so Lingkar Luar Barat Palembang
City Banyuasin – Jakabaring street is a class II A road with the speed of the road
plan 40 km/hour, and this road used 5 curves. For surface area hard compact
thickness is 10 cm used asphalt concrete, sub base is 20 cm used split class A and
base is 30 cm used sirtu class A. This road building was carried out within 182
days with a total fund Rp 49.763.033.000,00.</description><date>2014-07</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/1/Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/1295/7/Daftar%20Pustaka.pdf</identifier><identifier> Susandi, Alek and Astra Yudha, Ona (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN LINGKAR LUAR BARAT KOTA PALEMBANG BANYUASIN – JAKABARING PROVINSI SUMATERA SELATAN STA 0+000 – STA 5+250. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>1295</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Susandi, Alek Astra Yudha, Ona |
title |
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
JALAN LINGKAR LUAR BARAT KOTA
PALEMBANG BANYUASIN – JAKABARING
PROVINSI SUMATERA SELATAN
STA 0+000 – STA 5+250 |
publishDate |
2014 |
topic |
TA Engineering (General). Civil engineering (General) |
url |
http://eprints.polsri.ac.id/1295/1/Cover.pdf http://eprints.polsri.ac.id/1295/2/BAB%20I.pdf http://eprints.polsri.ac.id/1295/3/BAB%20II.pdf http://eprints.polsri.ac.id/1295/4/BAB%20III.pdf http://eprints.polsri.ac.id/1295/5/BAB%20IV.pdf http://eprints.polsri.ac.id/1295/6/BAB%20V.pdf http://eprints.polsri.ac.id/1295/7/Daftar%20Pustaka.pdf http://eprints.polsri.ac.id/1295/ |
contents |
The Road Lingkar Luar Barat Palembang City Banyuasin – Jakabaring street
is a road that connects the Banyuasin and cross Jakabaring, this road has a very
important role in promoting economic growth both locally and nationally. The
final report this writing, the author would like to know how the planning and
design of geometric and hard compact on Lingkar Luar Barat Palembang City
Banyuasin – Jakabaring street, so that the road will be able to give a sense of
security, convenient, and economical way for the user.
In the planning design of geometric road, things become a reference in
planning include the horizontal alinyemen calculation, vertical alinyemen, hard
compact and define what that will be used.
From the results of above calculations, so Lingkar Luar Barat Palembang
City Banyuasin – Jakabaring street is a class II A road with the speed of the road
plan 40 km/hour, and this road used 5 curves. For surface area hard compact
thickness is 10 cm used asphalt concrete, sub base is 20 cm used split class A and
base is 30 cm used sirtu class A. This road building was carried out within 182
days with a total fund Rp 49.763.033.000,00. |
id |
IOS15200.1295 |
institution |
Politeknik Negeri Sriwijaya |
institution_id |
186 |
institution_type |
library:university library |
library |
Perpustakaan Politeknik Negeri Sriwijaya |
library_id |
333 |
collection |
Perpustakaan Politeknik Negeri Sriwijaya |
repository_id |
15200 |
city |
KOTA PALEMBANG |
province |
SUMATERA SELATAN |
repoId |
IOS15200 |
first_indexed |
2021-08-25T09:28:38Z |
last_indexed |
2021-08-25T09:28:38Z |
recordtype |
dc |
_version_ |
1709058400155860992 |
score |
17.538404 |