Daftar Isi:
  • Sheet Pile used as a retaining wall construction. Construction is later expected to prevent scour the land and prevent land sliding and can make the area surrounding the banks of the River Musi to cleanly and beautifully. Sheet Pile on the project is planned to make the area as a place Ulu 11-14 people daily activities. Planning of the concrete sheet pileusing the method calculation of budget plan (RAB), Description Unit Price Analysis and Compensation Network Planning (NWP) to determine the time and squence of work to do and to control the financial progress of the work and to use the curve S. Based on the calculation, it can be concluded concrete sheet pile serving vessel up to 5,154 ton.m weights. With a 20 cm thick plate, beam size 40 x 70 cm, the size of the pile cap 80 x 100 cm, the size 50 and 60 cm pile, and to carry out this project requires funding budget of Rp. 6.128.892.000