Penjadwalan Produksi Bordir Kain Di CV Djarum Mulia Embroidery
Main Authors: | Prihastono, Endro, ., Khaerudin |
---|---|
Format: | Article info application/pdf eJournal |
Bahasa: | eng |
Terbitan: |
Jurnal Ilmiah Dinamika Teknik
, 2017
|
Online Access: |
https://www.unisbank.ac.id/ojs/index.php/ft1/article/view/4748 https://www.unisbank.ac.id/ojs/index.php/ft1/article/view/4748/1465 |
Daftar Isi:
- Scheduling is sort manufacture/ workmanship of the product thoroughly done on multiple machines. Thus the problem sequencing (sequencing) always involves supply number of components that are often referred to as a job. Job himself is still a composition and a number of basic elements called activities or operations. The production process of existing border cloth CV. Djarum Mulia Embroidery is divided into two divisions of production which is a division 1 and division 2 garment while the division is a division local.di each division is divided into several mutually job sequence to produce embroidery products. Keywords : Scheduling, Production