KAJIAN CATU DAYA LISTRIK CADANGAN DI ASRAMA TOWER 2 SEKOLAH TINGGI PENERBANGAN INDONESIA
Main Authors: | Ruri Haryati, Hendro Widiarto, Harman Sudjanto |
---|---|
Format: | Article info application/pdf Journal |
Bahasa: | eng |
Terbitan: |
Politeknik Penerbangan Indonesia Curug
, 2017
|
Subjects: | |
Online Access: |
http://journal.ppicurug.ac.id/index.php/jurnal-langit-biru/article/view/261 http://journal.ppicurug.ac.id/index.php/jurnal-langit-biru/article/view/261/268 |
Daftar Isi:
- On this situation, tower 2 dormitory dont have generator set as a back up power supply, so if the main supply from PLN off, all the activity an all infrastructure on dormitory will be stoped and not operate. The process in this study is start from checking all the load on tower 2 dormitory, counting the ideal capacity of the generator set, counting the maximum current of genetator set and ideal position of the generator set. Writer hope this study will be applied in tower 2 dormitory as a solution if the main supply off, so all the activity will be continues.
- Dimana kondisi saat ini asrama tower 2 belum memiliki generator set sebagai catu daya listrik cadangan, sehinnga jika terjadi pemadaman listrik oleh PLN, maka seluruh kegiatan keasramaan maupun sarana prasarana yang ada di asrama tower harus terhenti atau tidak dapat beroperasi. Proses pengambilan data dimulai dari pendataan beban yang terpasang saat ini, perhitungan kapasitas generator set yang akan dipasang, perhitungan pengaman yang akan dipasang serta tata letak generator set yang akan dipasang. Kajian ini diharapkan dapat terlaksana sehingga asrama tower 2 memiliki catu daya listrik cadangan.