ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKTUR ATAS PADA PROYEK APARTEMENT KUNINGAN LOT. 16 TOWER -3
ctrlnum |
1331 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repo.bunghatta.ac.id/1331/</relation><title>ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKTUR ATAS PADA
PROYEK APARTEMENT KUNINGAN LOT. 16 TOWER -3</title><creator>Aldi, Dahlani</creator><creator>Nursyam, Saleh</creator><creator>Putranesia, Thaha</creator><subject>TH Building construction</subject><description>Tugas Akhir ini merupakan perhitungan ulang yang dilakukan pada proyek Apartement
Kuningan Lot. 16 tower - 3. Tugas Akhir ini dibuat untuk mengetahui kemampuan dalam
menganalisa gambar rencana dan melakukan perhitungan detail estimate yang terdiri dari
volume, rencana anggaran biaya, time schedule dan cash flow.Proyek Apartement
Kuningan Lot. 16 tower -3Jl. Epicentrum Tengah, Karet Kuningan, Jakarta Selatan dari
32 lantai dan 1 lantai atap dengan luas bangunan± 27705m
2
. Dari hasil perhitungan
estimasi biaya struktur atas yang meliputi pekerjaan kolom, corewall, balok, plat lantai
dan tangga didapatkan biaya proyek sebesar Rp 60.157.635.867dengan menggunakan
harga satuan kota Jakarta tahun 2016. Total biaya tersebut sudah termasuk PPn
10%.Penjadwalan kerja menghasilkan kurva S yang menjadi pedoman dari kebutuhan
dan pengeluaran biaya proyek tersebut. Dengan total pekerjaan struktur atas yang
dilakukan selama 22 bulan. Pada bulan ke 22 selisih antara cash-in dengan cash-out
sebesar Rp 0. Dari analisa perencanaan cash flow dapat disimpulkan bahwa dengan
system pembayaran selama 22 bulan dengan uang muka 20% didapatkan hasil yang
optimal karena pembayaran yang cukup besar pada bulan pertama membuat uang kas
proyek membantu kesulitan pada bulan-bulan terakhir.

Kata Kunci
Detail Estimasi, Analisa Biaya, Time Schedule, Kurva S, Cash Flow, Studi Kasus</description><date>2020-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/1/6%20ALDI%20DAHLANI%20%281510015410097%29%20COVER.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/2/6%20ALDI%20DAHLANI%20%281510015410097%29%20ABSTRAK.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/3/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/4/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/5/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/6/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1331/7/6%20ALDI%20DAHLANI%20%281510015410097%29%20DAFTAR%20PUSTAKA.pdf</identifier><identifier> Aldi, Dahlani and Nursyam, Saleh and Putranesia, Thaha (2020) ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKTUR ATAS PADA PROYEK APARTEMENT KUNINGAN LOT. 16 TOWER -3. Diploma thesis, UNIVERSITAS BUNG HATTA. </identifier><recordID>1331</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Aldi, Dahlani Nursyam, Saleh Putranesia, Thaha |
title |
ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKTUR ATAS PADA
PROYEK APARTEMENT KUNINGAN LOT. 16 TOWER -3 |
publishDate |
2020 |
isbn |
2815100154100 |
topic |
TH Building construction |
url |
http://repo.bunghatta.ac.id/1331/1/6%20ALDI%20DAHLANI%20%281510015410097%29%20COVER.pdf http://repo.bunghatta.ac.id/1331/2/6%20ALDI%20DAHLANI%20%281510015410097%29%20ABSTRAK.pdf http://repo.bunghatta.ac.id/1331/3/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20I.pdf http://repo.bunghatta.ac.id/1331/4/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20II.pdf http://repo.bunghatta.ac.id/1331/5/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20III.pdf http://repo.bunghatta.ac.id/1331/6/6%20ALDI%20DAHLANI%20%281510015410097%29%20BAB%20IV.pdf http://repo.bunghatta.ac.id/1331/7/6%20ALDI%20DAHLANI%20%281510015410097%29%20DAFTAR%20PUSTAKA.pdf http://repo.bunghatta.ac.id/1331/ |
contents |
Tugas Akhir ini merupakan perhitungan ulang yang dilakukan pada proyek Apartement
Kuningan Lot. 16 tower - 3. Tugas Akhir ini dibuat untuk mengetahui kemampuan dalam
menganalisa gambar rencana dan melakukan perhitungan detail estimate yang terdiri dari
volume, rencana anggaran biaya, time schedule dan cash flow.Proyek Apartement
Kuningan Lot. 16 tower -3Jl. Epicentrum Tengah, Karet Kuningan, Jakarta Selatan dari
32 lantai dan 1 lantai atap dengan luas bangunan± 27705m
2
. Dari hasil perhitungan
estimasi biaya struktur atas yang meliputi pekerjaan kolom, corewall, balok, plat lantai
dan tangga didapatkan biaya proyek sebesar Rp 60.157.635.867dengan menggunakan
harga satuan kota Jakarta tahun 2016. Total biaya tersebut sudah termasuk PPn
10%.Penjadwalan kerja menghasilkan kurva S yang menjadi pedoman dari kebutuhan
dan pengeluaran biaya proyek tersebut. Dengan total pekerjaan struktur atas yang
dilakukan selama 22 bulan. Pada bulan ke 22 selisih antara cash-in dengan cash-out
sebesar Rp 0. Dari analisa perencanaan cash flow dapat disimpulkan bahwa dengan
system pembayaran selama 22 bulan dengan uang muka 20% didapatkan hasil yang
optimal karena pembayaran yang cukup besar pada bulan pertama membuat uang kas
proyek membantu kesulitan pada bulan-bulan terakhir.
Kata Kunci
Detail Estimasi, Analisa Biaya, Time Schedule, Kurva S, Cash Flow, Studi Kasus |
id |
IOS14200.1331 |
institution |
universitas bung hatta |
affiliation |
onesearch.perpusnas.go.id |
institution_id |
2476 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Bung Hatta |
library_id |
3754 |
collection |
Repository Universitas Bung Hatta |
repository_id |
14200 |
city |
KOTA PADANG |
province |
SUMATERA BARAT |
repoId |
IOS14200 |
first_indexed |
2020-10-21T10:49:57Z |
last_indexed |
2020-10-21T10:49:57Z |
recordtype |
dc |
_version_ |
1686871794123800576 |
score |
17.538404 |