Skip to content
  • Tentang IOS
  • Join Us
  • Hubungi Kami
  • Organisasi Mitra
  • Akun Anda
  • Keluar
  • Masuk
  • Bahasa Indonesia
    • Bahasa Indonesia
    • English
Lanjutan
  • Cari
  • ANALISIS PERAWATAN MESIN CONVE...
  • Preview
  • Koleksi Nasional
  • Sitasi Cantuman
  • Kirim via Email
  • Ekspor Cantuman
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Favorit
Cover Image

ANALISIS PERAWATAN MESIN CONVEYOR UNLOADING PHOSPHATE ROCK MESIR DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) (Studi Kasus di PT Petrokimia Gresik)

Tersimpan di:
Main Author: PRAJA, INDRA IKHSAN
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2019
Subjects:
Industrial Engineering
Engineering
Online Access: http://eprints.umg.ac.id/2612/1/ABSTRAK.pdf
http://eprints.umg.ac.id/2612/2/BAB%20I.pdf
http://eprints.umg.ac.id/2612/3/BAB%20II.pdf
http://eprints.umg.ac.id/2612/4/BAB%20III.pdf
http://eprints.umg.ac.id/2612/5/BAB%20IV.pdf
http://eprints.umg.ac.id/2612/6/BAB%20V.pdf
http://eprints.umg.ac.id/2612/7/BAB%20VI.pdf
http://eprints.umg.ac.id/2612/8/DAFTAR%20PUSTAKA.pdf
http://eprints.umg.ac.id/2612/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Lihat Juga

  • ANALISIS PERAWATAN MESIN CONVEYOR UNLOADING PHOSPHATE ROCK MESIR DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) (Studi Kasus di PT PETROKIMIA GRESIK)
    oleh: PRAJA, INDRA IKHSAN, et al.
  • PERENCANAAN MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN SATURATOR R-301 DI PT. PETROKIMIA GRESIK (PERSERO). Tbk
    oleh: Argam, Murayana
    Terbitan: (2011)
  • MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN DEKOMPOSER DI PETROGANIK PT. PETROKIMIA GRESIK
    oleh: PRIMA , PANGLIPUR J
    Terbitan: (2010)
  • Analisis Perawatan Mesin Bubut Konvensional Dengan Metode Reliability Centered Maintenance (Rcm) Di Pt. Chitra Bhaskara Indah
    oleh: Arief Setiawan, .
    Terbitan: (2018)
  • Perencanaan Kegiatan Perawatan Pada Unit Produksi Butiran (padat)Dengan Basic: RCM (Reliability Centered Maintenance) Di PT Petrokimia Kayaku Gresik
    oleh: Nisa , Masruroh
    Terbitan: (2008)

Opsi Pencarian

  • Sejarah Pencarian
  • Pencarian Lanjut

Temukan Lebih Banyak

  • Penelusuran Katalog
  • Penelusuran Alfabetis

Butuh Bantuan?

  • Tips Pencarian
  • Admin
  • Hubungi Kami
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...