PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) KOMUNAL CLUSTER RIVERPLACE PERUMAHAN TIRTASANI KABUPATEN MALANG

Main Authors: Pudjowati, M.Si, Dr. Dra. Utami Retno, Zenurianto, Muhamad
Format: Article info application/pdf Journal
Bahasa: eng
Terbitan: Jurusan Teknik Sipil, Politeknik Negeri Malang , 2019
Online Access: http://prokons.polinema.ac.id/index.php/PROKONS/article/view/212
http://prokons.polinema.ac.id/index.php/PROKONS/article/view/212/202
Daftar Isi:
  • Tirtasani Estate doesn’t have communal wastewater treatment which makes the water polluted. To solve those problems, the writer intended to design wastewater treatment plant. This thesis aimed to (1) find the waswater discharge (2) design the wastewater treatment plant (WWTP) system (3) estimate the cost of WWTP manufacturing.The data needed for this design were the map of the housing, Tirtasani estate’s topographic map, Work Unit Price of Malang District 2018. The data were obtained from site surveys.The design resulted in (1) 85.6 m3 / day wastwater discharge (2) wastewater discharge made into f 4” wastewater pipe; 3 unit of 30 m3 WWTP tank with Anaerobic aerobic system ; 3.25 m x 9.5 m x 3.5 m WWTP structure. Keywords: communal, design, WWTP