Perencanaan Teknis Dan Anggaran Biaya Sistem Penyaliran Tambang Pada Tambang Terbuka Batu Andesit PT. Anshar Terang Crushindo Pangkalan Kabupaten 50 Kota Provinsi Sumatera Barat

Main Authors: Wirmanto, Wirmanto, Kasim, Tamrin, Murad, Murad
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Jurusan Teknik Pertambangan FT UNP , 2019
Subjects:
Online Access: http://ejournal.unp.ac.id/index.php/mining/article/view/103655
http://ejournal.unp.ac.id/index.php/mining/article/view/103655/101432
http://ejournal.unp.ac.id/index.php/mining/article/downloadSuppFile/103655/1609
ctrlnum article-103655
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">Perencanaan Teknis Dan Anggaran Biaya Sistem Penyaliran Tambang Pada Tambang Terbuka Batu Andesit PT. Anshar Terang Crushindo Pangkalan Kabupaten 50 Kota Provinsi Sumatera Barat</title><creator>Wirmanto, Wirmanto</creator><creator>Kasim, Tamrin</creator><creator>Murad, Murad</creator><subject lang="en-US">Andesit Stone, Catchment Area, Sump, Pump, cost</subject><description lang="en-US">Abstract. PT. Ansar Terang Crushindo is one of a company working in the&#xA0;mining of&#xA0;andesite, located&#xA0;Jorong Pauah Anok Nagari Pangkalan Kecamatan Pangkalan Kabupaten 50 kota Sumatera Barat. Draining system applied in PT Ansar Terang Crushindo is a mine dewatering system. When rainy season, rainfall the higher so as to discharge some runoff who entered the mine is getting higher it leads to the increasing the volume of water that accumulated on sump, so sump overflows and can not accommodate the incoming water. Water that has been gathered at sump will is pumped to open channels for later diverted back out mine to river. From the results of research and observation catchment areas in PT. ATC is 3,1 hectares. The capacity of optimal sump to cover the water runoff and groundwater is 3.050 m. The minimum pump discharge needed to remove water is 0.00553 m3 / second and the pumping time is at least 9 hours per day. The pump used is a Centrifugal Niagara Self Priming pump with a total head of 18 meters, a maximum installed capacity of 0.0395 m3 / second and a maximum rotation of 1700 rpm of 1 unit. The results of pumping are channeled to the open channel, the shape of the open channel section made is trapezoid, the dimensions of the surface width are 1 m, the base width is 0.5 m, the depth is 0.5 m. Then from the open channel is passed to the mud settling pond (settling pond) which has 2 compartments. The total cost of the mine drainage system is Rp. 56.636.523.Keywords: Andesit Stone, Catchment Area, Sump, Pump, cost</description><publisher lang="en-US">Jurusan Teknik Pertambangan FT UNP</publisher><contributor lang="en-US"/><date>2019-03-18</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>http://ejournal.unp.ac.id/index.php/mining/article/view/103655</identifier><source lang="en-US">Bina Tambang; Vol 4, No 1 (2019): JURNAL BINA TAMBANG; 414-423</source><source>2302-3333</source><language>eng</language><relation>http://ejournal.unp.ac.id/index.php/mining/article/view/103655/101432</relation><relation>http://ejournal.unp.ac.id/index.php/mining/article/downloadSuppFile/103655/1609</relation><rights lang="en-US">Copyright (c) 2019 Bina Tambang</rights><recordID>article-103655</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:eJournal
author Wirmanto, Wirmanto
Kasim, Tamrin
Murad, Murad
title Perencanaan Teknis Dan Anggaran Biaya Sistem Penyaliran Tambang Pada Tambang Terbuka Batu Andesit PT. Anshar Terang Crushindo Pangkalan Kabupaten 50 Kota Provinsi Sumatera Barat
publisher Jurusan Teknik Pertambangan FT UNP
publishDate 2019
topic Andesit Stone
Catchment Area
Sump
Pump
cost
url http://ejournal.unp.ac.id/index.php/mining/article/view/103655
http://ejournal.unp.ac.id/index.php/mining/article/view/103655/101432
http://ejournal.unp.ac.id/index.php/mining/article/downloadSuppFile/103655/1609
contents Abstract. PT. Ansar Terang Crushindo is one of a company working in the mining of andesite, located Jorong Pauah Anok Nagari Pangkalan Kecamatan Pangkalan Kabupaten 50 kota Sumatera Barat. Draining system applied in PT Ansar Terang Crushindo is a mine dewatering system. When rainy season, rainfall the higher so as to discharge some runoff who entered the mine is getting higher it leads to the increasing the volume of water that accumulated on sump, so sump overflows and can not accommodate the incoming water. Water that has been gathered at sump will is pumped to open channels for later diverted back out mine to river. From the results of research and observation catchment areas in PT. ATC is 3,1 hectares. The capacity of optimal sump to cover the water runoff and groundwater is 3.050 m. The minimum pump discharge needed to remove water is 0.00553 m3 / second and the pumping time is at least 9 hours per day. The pump used is a Centrifugal Niagara Self Priming pump with a total head of 18 meters, a maximum installed capacity of 0.0395 m3 / second and a maximum rotation of 1700 rpm of 1 unit. The results of pumping are channeled to the open channel, the shape of the open channel section made is trapezoid, the dimensions of the surface width are 1 m, the base width is 0.5 m, the depth is 0.5 m. Then from the open channel is passed to the mud settling pond (settling pond) which has 2 compartments. The total cost of the mine drainage system is Rp. 56.636.523.Keywords: Andesit Stone, Catchment Area, Sump, Pump, cost
id IOS124.article-103655
institution Universitas Negeri Padang
institution_id 56
institution_type library:university
library
library Perpustakaan Universitas Negeri Padang
library_id 565
collection Bina Tambang
repository_id 124
city KOTA PADANG
province SUMATERA BARAT
repoId IOS124
first_indexed 2019-05-02T14:08:56Z
last_indexed 2019-06-30T21:02:15Z
recordtype dc
_version_ 1800656699730690048
score 16.845257