Using Max-Plus Algebra in The Flow Shop Scheduling

Main Author: Subiono, Subiono; Mathematics, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Institut Teknologi Sepuluh Nopember , 2009
Subjects:
Online Access: http://iptek.its.ac.id/index.php/jts/article/view/105
http://iptek.its.ac.id/index.php/jts/article/view/105/97
Daftar Isi:
  • In this paper, it is discussed notion of maxplus algebra and their properties. A model of flow shop production system and analyze the dynamical behavior of the system for scheduling problems are derived by means of max-plus algebra. The solutions of these problems are that the optimal sequence of jobs and the regular scheduling are obtained.