Using Max-Plus Algebra in The Flow Shop Scheduling
Main Author: | Subiono, Subiono; Mathematics, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia |
---|---|
Format: | Article info application/pdf eJournal |
Bahasa: | eng |
Terbitan: |
Institut Teknologi Sepuluh Nopember
, 2009
|
Subjects: | |
Online Access: |
http://iptek.its.ac.id/index.php/jts/article/view/105 http://iptek.its.ac.id/index.php/jts/article/view/105/97 |
Daftar Isi:
- In this paper, it is discussed notion of maxplus algebra and their properties. A model of flow shop production system and analyze the dynamical behavior of the system for scheduling problems are derived by means of max-plus algebra. The solutions of these problems are that the optimal sequence of jobs and the regular scheduling are obtained.