|
|
|
|
LEADER |
01057cam a2200289 a 4500 |
001 |
INLIS000000000875683 |
005 |
20191120134503.0 |
006 |
aa g | 000 0 |
007 |
ta |
008 |
191120s2017 jbia g | 000 0 eng |
020 |
# |
# |
|a 978-602-0705-08-8
|
035 |
# |
# |
|a 0010-0119004974
|
040 |
# |
# |
|a JKPNPNA
|b eng
|
082 |
0 |
4 |
|a 531.6
|2 [23]
|
090 |
# |
# |
|a CB[G]-D.10 2017-7014
|
111 |
2 |
# |
|a ITB International Geothermal Workshop
|n (ke-6 :
|d 2017 :
|c Bandung)
|
245 |
1 |
0 |
|a Proceedings 6th ITB International Geothermal Workshop 2017 :
|b The rise of geothermal development in Indonesia : Resource transformation strategy towards 7000 MWe capacity, Bandung, March 22-23, 2017 /
|c ITB International Geothermal Workshop ; editor, Suryantini
|
250 |
# |
# |
|a Cet. 1
|
260 |
# |
# |
|a Bandung :
|b ITB Press,
|c 2017
|
300 |
# |
# |
|a viii, 498 hlm. :
|b ilus. ;
|c 30 cm
|
504 |
# |
# |
|a Termasuk bibliografi
|
650 |
# |
4 |
|a Energi geothermal
|x Kongres dan konvensi
|
700 |
0 |
# |
|a Suryantini
|
850 |
# |
# |
|a JKPNPNA
|
999 |
# |
# |
|a 3226/DM/D/2019
|
999 |
# |
# |
|a 201700101024877
|
999 |
# |
# |
|a 201700101024878
|