ANALISIS OVERALL EQUIPMENT EFFECTIVENESS UNTUK MENINGKATKAN WAKTU PRODUKSI BACKHOE DAN DUMP TRUCK PADA AKTIVITAS PENAMBANGAN DI PT. DIZAMATRA POWERINDO, LAHAT, SUMATERA SELATAN
Internet
http://repository.unsri.ac.id/7083/1/RAMA_%2031201_%2003121002018_0017048203_01_front_ref.pdfhttp://repository.unsri.ac.id/7083/2/RAMA_%2031201_%2003121002018_0017048203_02.pdf
http://repository.unsri.ac.id/7083/3/RAMA_%2031201_%2003121002018_0017048203_03.pdf
http://repository.unsri.ac.id/7083/4/RAMA_%2031201_%2003121002018_0017048203_04.pdf
http://repository.unsri.ac.id/7083/5/RAMA_%2031201_%2003121002018_0017048203_05.pdf
http://repository.unsri.ac.id/7083/6/RAMA_%2031201_%2003121002018_0017048203_06.ref.pdf
http://repository.unsri.ac.id/7083/7/RAMA_%2031201_%2003121002018_0017048203_07_lamp.pdf
http://repository.unsri.ac.id/7083/
Lokasi
Koleksi | Sriwijaya University Institutional Repository |
---|---|
Gedung | UPT Perpustakaan Universitas Sriwijaya |
Institusi | Universitas Sriwijaya |
Kota | OGAN ILIR |
Provinsi | SUMATERA SELATAN |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |