Indonesia OneSearch
Gravitasi
  • Cari
  • PRA RENCANA PABRIK PEMBUATAN S...
  • Lokasi
Cover Image

PRA RENCANA PABRIK PEMBUATAN SODIUM PEROKSIDA KAPASITAS 174.000 TON/TAHUN

Tersimpan di:
Main Authors: RAHMAN, M. LUTHFI FADHLI, AL FARIDZI, MOHAMMAD RAYFI, Nasir, Subriyer
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2018
Subjects:
TP155.5P4 Chemical plants > Design and construction
Online Access: http://repository.unsri.ac.id/14160/1/RAMA_24201_03031181419026_03031281419102_009096003_01_front_ref.pdf
http://repository.unsri.ac.id/14160/2/RAMA_24201_03031181419026_03031281419102_009096003_02.pdf
http://repository.unsri.ac.id/14160/3/RAMA_24201_03031181419026_03031281419102_009096003_03.pdf
http://repository.unsri.ac.id/14160/4/RAMA_24201_03031181419026_03031281419102_009096003_04.pdf
http://repository.unsri.ac.id/14160/5/RAMA_24201_03031181419026_03031281419102_009096003_05.pdf
http://repository.unsri.ac.id/14160/6/RAMA_24201_03031181419026_03031281419102_009096003_06.pdf
http://repository.unsri.ac.id/14160/7/RAMA_24201_03031181419026_03031281419102_009096003_07.pdf
http://repository.unsri.ac.id/14160/8/RAMA_24201_03031181419026_03031281419102_009096003_08.pdf
http://repository.unsri.ac.id/14160/9/RAMA_24201_03031181419026_03031281419102_009096003_09.pdf
http://repository.unsri.ac.id/14160/10/RAMA_24201_03031181419026_03031281419102_009096003_10.ref.pdf
http://repository.unsri.ac.id/14160/11/RAMA_24201_03031181419026_03031281419102_009096003_11_lamp.pdf
http://repository.unsri.ac.id/14160/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repository.unsri.ac.id/14160/1/RAMA_24201_03031181419026_03031281419102_009096003_01_front_ref.pdf
http://repository.unsri.ac.id/14160/2/RAMA_24201_03031181419026_03031281419102_009096003_02.pdf
http://repository.unsri.ac.id/14160/3/RAMA_24201_03031181419026_03031281419102_009096003_03.pdf
http://repository.unsri.ac.id/14160/4/RAMA_24201_03031181419026_03031281419102_009096003_04.pdf
http://repository.unsri.ac.id/14160/5/RAMA_24201_03031181419026_03031281419102_009096003_05.pdf
http://repository.unsri.ac.id/14160/6/RAMA_24201_03031181419026_03031281419102_009096003_06.pdf
http://repository.unsri.ac.id/14160/7/RAMA_24201_03031181419026_03031281419102_009096003_07.pdf
http://repository.unsri.ac.id/14160/8/RAMA_24201_03031181419026_03031281419102_009096003_08.pdf
http://repository.unsri.ac.id/14160/9/RAMA_24201_03031181419026_03031281419102_009096003_09.pdf
http://repository.unsri.ac.id/14160/10/RAMA_24201_03031181419026_03031281419102_009096003_10.ref.pdf
http://repository.unsri.ac.id/14160/11/RAMA_24201_03031181419026_03031281419102_009096003_11_lamp.pdf
http://repository.unsri.ac.id/14160/

Lokasi

Koleksi Sriwijaya University Institutional Repository
Gedung UPT Perpustakaan Universitas Sriwijaya
Institusi Universitas Sriwijaya
Kota OGAN ILIR
Provinsi SUMATERA SELATAN
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • PRA RENCANA PABRIK PEMBUATAN AMMONIA KAPASITAS 350.000 TON/TAHUN
    oleh: KADARSIH, SUCI, et al.
    Terbitan: (2018)
  • PRA RANCANGAN PABRIK PEMBUATAN NEOPENTANE KAPASITAS 115.000 TON/TAHUN
    oleh: WIRAWAN, HABIL MAJID, et al.
    Terbitan: (2019)
  • PRA RENCANA PABRIK PEMBUATAN PROPILEN OKSIDA DARI PROPILEN DAN HIDROGEN PEROKSIDA DENGAN KAPASITAS 60.000 TON/TAHUN
    oleh: PERMATA, ISDIANTI, et al.
    Terbitan: (2019)
  • PRA RENCANA PABRIK PEMBUATAN METANOL KAPASITAS 420.000 TON/TAHUN
    oleh: UTAMI, DWI INDAH, et al.
    Terbitan: (2018)
  • PRA RENCANA PABRIK PEMBUATAN METAKROLEIN KAPASITAS 80.000 TON/TAHUN
    oleh: A, JEFRY MULIADY, et al.
    Terbitan: (2019)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...