Indonesia OneSearch
Gravitasi
  • Cari
  • The Analysis Of Risk Managemen...
  • Lokasi
Cover Image

The Analysis Of Risk Management Implementation On Hospital Construction Project; Penulis: Frans Himawan Tanojo, Sutanto Hidayat, Subandiyah

Tersimpan di:
Main Authors: Tanojo, Frans Himawan, Hidayat, Sutanto, Azis, Subandiyah
Format: Article PeerReviewed Book
Bahasa: eng
Terbitan: IAEME Publication , 2018
Subjects:
Civil Engineering
Online Access: http://eprints.itn.ac.id/3508/1/IJCIET_09_07_060.pdf
http://eprints.itn.ac.id/3508/2/PSmarkup_Hidayat_Sutanto_THE_ANALYSIS_OF_RISK_MANAGEMENT_IMPLEMENTATION_ON_HOSPITAL_CONSTRUCTION_PROJECT.pdf
http://eprints.itn.ac.id/3508/5/The%20Analysis%20Of%20Risk%20Management%20Implementation%20On%20Hospital%20Construction%20Project.pdf
http://eprints.itn.ac.id/3508/10/pereview%20tanto_analysis.pdf
http://eprints.itn.ac.id/3508/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.itn.ac.id/3508/1/IJCIET_09_07_060.pdf
http://eprints.itn.ac.id/3508/2/PSmarkup_Hidayat_Sutanto_THE_ANALYSIS_OF_RISK_MANAGEMENT_IMPLEMENTATION_ON_HOSPITAL_CONSTRUCTION_PROJECT.pdf
http://eprints.itn.ac.id/3508/5/The%20Analysis%20Of%20Risk%20Management%20Implementation%20On%20Hospital%20Construction%20Project.pdf
http://eprints.itn.ac.id/3508/10/pereview%20tanto_analysis.pdf
http://eprints.itn.ac.id/3508/

Lokasi

Koleksi Eprints ITN Malang
Gedung Perpustakaan Institut Teknologi Nasional Malang
Institusi Institut Teknologi Nasional Malang
Kota KOTA MALANG
Provinsi JAWA TIMUR
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • Optimization of Rescheduling and Economy Analysis of the Implementation of Kwitang Office Park Building Constructio n Project in Jakarta
    oleh: Azis, Subandiyah, et al.
    Terbitan: (2017)
  • THE ACCELERATING OF DURATION AND CHANGE OF COST ON CONSTRUCTION PROJECT IMPLEMENTATION
    oleh: Harjanto, Ruddy, et al.
    Terbitan: (2019)
  • ANALISA MANAJEMEN RISIKO PADA PELAKSANAAN PEKERJAAN KONTRUKSI PEMBANGUNAN GEDUNG RAWAT INAP RUMAH SAKIT UMUM DAERAH CIBINONG
    oleh: Tanojo, Frans Himawan
    Terbitan: (2018)
  • Optimization of the Combination of Heavy Equipment Use in Land-Filling Work in Terms of Time and Cost in the Construction Project of Job Training Center at Ende District of East Nusa Tenggara
    oleh: Azis, Subandiyah
    Terbitan: (2018)
  • THE EFFECT OF PROJECT MANAGER COMPETENCY ON PROJECT TIME PERFORMANCE
    oleh: azis, subandiyah
    Terbitan: (2017)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...