ANALISA WAKTUDAN BIAYA PENGGUNAAN ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG INTENSIF TERPADU ( IGD, IBS DAN ICU ) RS. ST. YUSUP
Main Author: | Sanam, Alyoen D.Y |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/2307/1/skripsi%20alyoen.pdf http://eprints.itn.ac.id/2307/ |
Internet
http://eprints.itn.ac.id/2307/1/skripsi%20alyoen.pdfhttp://eprints.itn.ac.id/2307/
Lokasi
Koleksi | Eprints ITN Malang |
---|---|
Gedung | Perpustakaan Institut Teknologi Nasional Malang |
Institusi | Institut Teknologi Nasional Malang |
Kota | KOTA MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |