EVALUASI PERCEPATAN WAKTU DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEMBANGUNAN LABORATORIUM SUMBER DAYA AIR TEKNIK PENGAIRAN UNIVERSITAS BRAWIJAYA
Main Author: | Widianto, Roziq |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2017
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/1923/1/SKRIPSI%20ROZIQ%20WIDIANTO.pdf http://eprints.itn.ac.id/1923/ |
Internet
http://eprints.itn.ac.id/1923/1/SKRIPSI%20ROZIQ%20WIDIANTO.pdfhttp://eprints.itn.ac.id/1923/
Lokasi
Koleksi | Eprints ITN Malang |
---|---|
Gedung | Perpustakaan Institut Teknologi Nasional Malang |
Institusi | Institut Teknologi Nasional Malang |
Kota | KOTA MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |