OPTIMASI PENJADWALAN DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN JEMBATAN PASEAN 2 KABUPATEN SAMPANG
Main Author: | PRIMESWARI, RESTY RIKA |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2018
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/1710/1/Untitled%2852%29.pdf http://eprints.itn.ac.id/1710/ |
Internet
http://eprints.itn.ac.id/1710/1/Untitled%2852%29.pdfhttp://eprints.itn.ac.id/1710/
Lokasi
Koleksi | Eprints ITN Malang |
---|---|
Gedung | Perpustakaan Institut Teknologi Nasional Malang |
Institusi | Institut Teknologi Nasional Malang |
Kota | KOTA MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |