Indonesia OneSearch
Gravitasi
  • Cari
  • Implementasi condition based m...
  • Lokasi
Cover Image

Implementasi condition based maintenance dan predictive maintenance di PT Arum Mas Jaya

Tersimpan di:
Main Author: Natha, Christopher
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2019
Subjects:
T55.4-60.8 Industrial engineering. Management engineering
Online Access: http://repository.uph.edu/8577/1/Title.pdf
http://repository.uph.edu/8577/2/Abstract.pdf
http://repository.uph.edu/8577/3/ToC.pdf
http://repository.uph.edu/8577/4/Chapter1.pdf
http://repository.uph.edu/8577/5/Chapter2.pdf
http://repository.uph.edu/8577/6/Chapter3.pdf
http://repository.uph.edu/8577/7/Chapter4.pdf
http://repository.uph.edu/8577/8/Chapter5.pdf
http://repository.uph.edu/8577/9/Chapter6.pdf
http://repository.uph.edu/8577/10/Bibliography.pdf
http://repository.uph.edu/8577/11/Appendices.pdf
http://repository.uph.edu/8577/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repository.uph.edu/8577/1/Title.pdf
http://repository.uph.edu/8577/2/Abstract.pdf
http://repository.uph.edu/8577/3/ToC.pdf
http://repository.uph.edu/8577/4/Chapter1.pdf
http://repository.uph.edu/8577/5/Chapter2.pdf
http://repository.uph.edu/8577/6/Chapter3.pdf
http://repository.uph.edu/8577/7/Chapter4.pdf
http://repository.uph.edu/8577/8/Chapter5.pdf
http://repository.uph.edu/8577/9/Chapter6.pdf
http://repository.uph.edu/8577/10/Bibliography.pdf
http://repository.uph.edu/8577/11/Appendices.pdf
http://repository.uph.edu/8577/

Lokasi

Koleksi Repository UPH
Gedung The Johannes Oentoro Library
Institusi Universitas Pelita Harapan
Kota KOTA TANGERANG
Provinsi BANTEN
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • Pengukuran kinerja lingkungan industri pada PT Presisi Jaya Sakti dengan pendekatan konsep industri ramping dan hijau = Measurement of industrial environment performance based on green industry in. Presisi Jaya Sakti
    oleh: Octavian, Hizkia Cahya
    Terbitan: (2019)
  • ANALISIS DAN DESAIN MODEL TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA DERMAGA SHIP-TO-SHORE DI PT. TERMINAL TELUK LAMONG
    oleh: MUHAMMAD ANNAS PUTRA, NIM: 041211232159
    Terbitan: (2017)
  • Analisis efisiensi waktu pemakaian cat oven dan audit energi listrik pada bengkel JNS Jaya Motor = Efficiency analysis of paint oven use time and electric energy audit in bengkel JNS Jaya Motor
    oleh: Raphael, Christopher
    Terbitan: (2019)
  • Analisis implementasi dan usulan pengembangan sistem erp pada CV Indah Jaya = Analysis of implementation and proposed development of erp systems in Indah Jaya CV
    oleh: Supangi, Patrick
    Terbitan: (2019)
  • Kajian kebutuhan tenaga kerja di industri batubara berdasarkan dimensi kualitas, kuantitas, dan waktu = Assessment of labor requirement in coal industry based on the dimensions of quality, quantity, and time
    oleh: Ongko, Darryl
    Terbitan: (2013)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...