Risk management of cost and time on upper structure high-rise building project from general contractor perspective who execute the project at Jabodetabek = Pengelolaan risiko terhadap biaya dan waktu pada pekerjaan struktur atas gedung bertingkat tinggi dari sudut pandang kontraktor utama yang melaksanakan proyek di Jabodetabek

Main Author: Fadhilah, Ahmad N.
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2016
Subjects:
Online Access: http://repository.uph.edu/1060/1/Title.pdf
http://repository.uph.edu/1060/2/Abstract.pdf
http://repository.uph.edu/1060/3/ToC.pdf
http://repository.uph.edu/1060/4/Chapter1.pdf
http://repository.uph.edu/1060/5/Chapter2.pdf
http://repository.uph.edu/1060/6/Chapter3.pdf
http://repository.uph.edu/1060/7/Chapter4.pdf
http://repository.uph.edu/1060/8/Chapter5.pdf
http://repository.uph.edu/1060/9/Bibliography.pdf
http://repository.uph.edu/1060/10/Appendices.pdf
http://repository.uph.edu/1060/11/Publication-Agreement.pdf
http://repository.uph.edu/1060/