APA Citation

AMIR, A. L. (2019). EVALUASI TERHADAP BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE METHOD (EVM) DAN STRUCTURAL EQUATION MODELING (SEM) PADA PROYEK BANGUNAN PARKIR.

Chicago Style Citation

AMIR, ADI LUKMAN. EVALUASI TERHADAP BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE METHOD (EVM) DAN STRUCTURAL EQUATION MODELING (SEM) PADA PROYEK BANGUNAN PARKIR. 2019.

MLA Citation

AMIR, ADI LUKMAN. EVALUASI TERHADAP BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE METHOD (EVM) DAN STRUCTURAL EQUATION MODELING (SEM) PADA PROYEK BANGUNAN PARKIR. 2019.

Warning: These citations may not always be 100% accurate.