Indonesia OneSearch
Gravitasi
  • Cari
  • PENERAPAN PENJADWALAN PROYEK I...
  • Lokasi
Cover Image

PENERAPAN PENJADWALAN PROYEK INSTALASI MICROWAVE MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM)

Tersimpan di:
Main Author: NEGARA, CYAN
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2018
Subjects:
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
Online Access: http://repository.mercubuana.ac.id/44328/1/1.%20Cover.pdf
http://repository.mercubuana.ac.id/44328/2/5.%20ABSTRAK.pdf
http://repository.mercubuana.ac.id/44328/3/3.%20Lembar%20Pernyataan.pdf
http://repository.mercubuana.ac.id/44328/4/2.%20Lembar%20Pengesahan.pdf
http://repository.mercubuana.ac.id/44328/5/6.%20KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/44328/6/7.%20DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/44328/7/8.%20DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/44328/8/9.%20DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/44328/9/10.%20BAB%20I.pdf
http://repository.mercubuana.ac.id/44328/11/11.%20BAB%20II.pdf
http://repository.mercubuana.ac.id/44328/10/12.%20BAB%20III.pdf
http://repository.mercubuana.ac.id/44328/12/13.%20BAB%20IV.pdf
http://repository.mercubuana.ac.id/44328/13/14.%20BAB%20V.pdf
http://repository.mercubuana.ac.id/44328/14/15.%20DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/44328/15/16.%20LAMPIRAN.pdf
http://repository.mercubuana.ac.id/44328/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repository.mercubuana.ac.id/44328/1/1.%20Cover.pdf
http://repository.mercubuana.ac.id/44328/2/5.%20ABSTRAK.pdf
http://repository.mercubuana.ac.id/44328/3/3.%20Lembar%20Pernyataan.pdf
http://repository.mercubuana.ac.id/44328/4/2.%20Lembar%20Pengesahan.pdf
http://repository.mercubuana.ac.id/44328/5/6.%20KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/44328/6/7.%20DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/44328/7/8.%20DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/44328/8/9.%20DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/44328/9/10.%20BAB%20I.pdf
http://repository.mercubuana.ac.id/44328/11/11.%20BAB%20II.pdf
http://repository.mercubuana.ac.id/44328/10/12.%20BAB%20III.pdf
http://repository.mercubuana.ac.id/44328/12/13.%20BAB%20IV.pdf
http://repository.mercubuana.ac.id/44328/13/14.%20BAB%20V.pdf
http://repository.mercubuana.ac.id/44328/14/15.%20DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/44328/15/16.%20LAMPIRAN.pdf
http://repository.mercubuana.ac.id/44328/

Lokasi

Koleksi Repository Universitas Mercu Buana
Gedung Perpustakaan Universitas Mercu Buana
Institusi Universitas Mercu Buana
Kota Jakarta Barat
Provinsi DKI JAKARTA
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • ANALISIS KETERLAMBATAN PEKERJAAN STRUKTUR DAN FINISHING MENGGUNAKAN CPM (CRITICAL PATH METHOD) (Studi Kasus : Proyek Sampoerna Karawang)
    oleh: A., MEGHAN OCHTIANTY
    Terbitan: (2020)
  • ANALISIS ALTERNATIF PENJADWALAN MENGGUNAKAN CRITICAL PATH METHOD ( CPM ) (Studi Kasus Proyek Pembangunan Wisma Flat Kedoya Selatan - Jakarta Barat)
    oleh: UMAM, SAEFUL
    Terbitan: (2019)
  • PENERAPAN CRITICAL CHAIN PROJECT MANAGEMENT DAN BUILDING INFORMATION MODELING (BIM) 4D PADA PEKERJAAN STRUKTUR ATAS PROYEK BANGUNAN GEDUNG HUNIAN BERTINGKAT TINGGI
    oleh: ADRIANSYAH, ADRIANSYAH
    Terbitan: (2019)
  • ANALISIS WAKTU PEKERJAAN STRUKTUR DENGAN METODE CRITICAL PATH METHOD (CPM) (Studi Kasus Proyek Pembangunan Rumah Dinas Anggota Puslabfor Polri Bogor)
    oleh: WIJIANTY, PIPIT
    Terbitan: (2018)
  • PENERAPAN CRITICAL PATH METHOD (CPM) PADA PROYEK PENGADAAN DAN PEMASANGAN JARINGAN TELEPON UNTUK WILAYAH JAWA BARAT DAN JAWA TIMUR YANG DILAKUKAN OLEH PT. INTI (PERSERO) BANDUNG
    oleh: Iim Ibrahim
    Terbitan: (2003)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...