TAMIMI, R. F. (2018). ANALISIS KETERLAMBATAN WAKTU BERBASIS MANAJEMEN RESIKO PADA PROYEK HIGHRISE BUILDING DENGAN METODE SEMI TOP-DOWN (Study Kasus Proyek Gedung Indonesia 1 - Jakarta).
Chicago Style CitationTAMIMI, RATNA FITRIA. ANALISIS KETERLAMBATAN WAKTU BERBASIS MANAJEMEN RESIKO PADA PROYEK HIGHRISE BUILDING DENGAN METODE SEMI TOP-DOWN (Study Kasus Proyek Gedung Indonesia 1 - Jakarta). 2018.
MLA CitationTAMIMI, RATNA FITRIA. ANALISIS KETERLAMBATAN WAKTU BERBASIS MANAJEMEN RESIKO PADA PROYEK HIGHRISE BUILDING DENGAN METODE SEMI TOP-DOWN (Study Kasus Proyek Gedung Indonesia 1 - Jakarta). 2018.
Warning: These citations may not always be 100% accurate.