Worowardani, E. (2013). MENGOPTIMALKAN MASTER PRODUCTION SCHEDULE (MPS) DAN MATERIAL REQUIREMENT PLANNING I (MRP I) E-RSPU P/ N 5903 MELALUI PERHITUNGAN ROUGH CUT CAPACITY PLANNING (RCCP) (Studi Kasus Pada PT Selamat Sempurna Tbk.).
Chicago Style CitationWorowardani, Endah. MENGOPTIMALKAN MASTER PRODUCTION SCHEDULE (MPS) DAN MATERIAL REQUIREMENT PLANNING I (MRP I) E-RSPU P/ N 5903 MELALUI PERHITUNGAN ROUGH CUT CAPACITY PLANNING (RCCP) (Studi Kasus Pada PT Selamat Sempurna Tbk.). 2013.
MLA CitationWorowardani, Endah. MENGOPTIMALKAN MASTER PRODUCTION SCHEDULE (MPS) DAN MATERIAL REQUIREMENT PLANNING I (MRP I) E-RSPU P/ N 5903 MELALUI PERHITUNGAN ROUGH CUT CAPACITY PLANNING (RCCP) (Studi Kasus Pada PT Selamat Sempurna Tbk.). 2013.
Warning: These citations may not always be 100% accurate.