EVALUASI KEWAJARAN SCHEDULE KONTRAKTOR MENGGUNAKAN WORK BREAKDOWN STRUCTURE (WBS) DAN MICROSOFT PROJECT (Studi pada proyek pembangunan SDN 5 Sokong, Tanjung, Lombok Utara) Contractor schedule equity evaluation using Work Breakdown Structure (WBS) and Microsoft Project (A study of building-construction project at SDN 5 Sokong, Tanjung, North Lombok) Artikel Ilmiah Untuk Memenuhi Sebagian Persyaratan Mencapai Derajat Sarjana S-1 Jurusan Teknik Sipil Oleh Lalu Wisesa Grahita Ramdhani F1A 015 071 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MATARAM 2020

Main Author: Lalu, Wisesa Grahita Ramdhani
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2020
Subjects:
Online Access: http://eprints.unram.ac.id/18595/1/Tugas%20Akhir-Lalu%20Wisesa%20Grahita%20Ramdhani.pdf
http://eprints.unram.ac.id/18595/

Internet

http://eprints.unram.ac.id/18595/1/Tugas%20Akhir-Lalu%20Wisesa%20Grahita%20Ramdhani.pdf
http://eprints.unram.ac.id/18595/

Lokasi

Koleksi Institutional Repository
Gedung Perpustakaan Universitas Mataram
Institusi Universitas Mataram
Kota KOTA MATARAM
Provinsi NUSA TENGGARA BARAT
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.